Communications Hub Outside 10 Silvertown Way Canning Town London E16 1ED Data via plota.co.uk

26/02269/FUL - Full Planning Permission Pending

Proposal

Removal and replacement of the existing telephone kiosk with a communications kiosk with integrated advertising display and defibrillator. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 26 Oct 2026
Decision
Expected by 21 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 20 Dec 2026, from Newham's recent signs and adverts.

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Newham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Canning Town
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
National infrastructure project about 620 m away: Silvertown Tunnel
The site is about 620 m from the project boundary. Highway, decided. The project page says whether consent was granted. Also within 2 km: Thames Tideway Tunnel (decided, about 1230 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Newham built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 11 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Newham
Application type
Full Planning Permission
Postcode
E16 1ED
Received
around 26 Oct 2026
Validated
26 Oct 2026
Ward
Canning Town South
Parish
Custom House And Canning Community Forum
Case officer
Show
Applicant
Show
Agent
JCDecaux

Decision outlook

Day 23 of the 56-day target. Newham usually decides signs and adverts by day 55.

Day 2333 days to the 56-day target
73%decided within 8 weeks
90%approved
108decided in the last year

Plota live figures for signs and adverts decided by Newham in the last twelve months, from validation. Newham decision record →

Public comments

No public comments yet.

Last counted 11 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
No
Newham
Planning Authority Score
3.7/10
Below average
#211 of 296 councils
Relevant to this application:
Householder decisions

Newham ranks #191 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Newham decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #239 of 296
87%
Householder approved
Below avg (90%) #233 of 296
59%
Decided in 8 weeks
Below avg (63%) #191 of 296
39%
Extended time limit
Below avg (41%) #140 of 296
51%
Minor dwellings approved
67 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
59%
Change of use approved
51 decided
989
Total decisions
170 refused in the year to March 2026