46-48 Norman Road, Greenwich, London SE10 9QX Data via plota.co.uk

26/3030/NM - Non Material Registered

Proposal

An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment pursuant to Condition 2 in connection with the planning permission reference , dated 26 October 2020, for the ''demolition of existing structures and the construction of a part 13 / part 17 storey building to provide 401sqm (GEA) of B1(a, b and c) and A3 floorspace at lower and upper ground floor level and 145 residential units with associated refuse and recycling storage, cycle parking, car parking, access, provision of public realm and landscaping'', to allow the following amendments: The installation of an exhaust flue for the back-up generator Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Oct 2026
✓
Consultation
4 Nov 2026
Decision
Expected by 18 Nov 2026

Under consideration

No decision has been issued yet. A decision is expected by 18 Nov 2026.

Associated applications 2

  • Part of

    FullApprovedcouncil archive

    Conditions 2 variation sought

    • AmendmentAn application submitted under Section 96a of the Town & Country Planning Act 1990…This application26/3030/NM

Site constraints 13

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 248 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Greenwich AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Greenwich West
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Local nature reserve 214 m away: Sue Godfrey Nature Park
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Radon affected area, class 2; 1 listed building within 150 m; Inside the Greenwich built-up area; Public transport access: PTAL 4 (good), TfL 2023, for the 100 m square; Flood defence 39 m away (wall, designed for a 1 in 1000 year flood); Priority habitat 39 m away: Mudflats.
Not affected
Not green belt · No scheduled monument at the site

Checked on 3 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Greenwich - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Greenwich
Application type
Non Material
Postcode
SE10 9QX
Received
21 Oct 2026
Validated
21 Oct 2026
Ward
GREENWICH CREEKSIDE
Parish
Greenwich
Case officer
Show
Target decision
18 Nov 2026
Applicant
Show
Agent
BPTW

Public comments

No public comments yet.

Last counted 4 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15311581
Planning Portal ref
PP-15311581
Consultation
4 Nov 2026
Statutory expiry
18 Nov 2026
Env. assessment
No
Greenwich
Planning Authority Score
5.4/10
Average
#123 of 296 councils
Relevant to this application:
Householder decisions

Greenwich is faster than most councils at deciding householder applications, ranking #76 out of 296. Only 29% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Greenwich is also one of the strictest councils - it refuses more householder applications than almost any other, with only 78% approved vs 90% nationally.

One of the strictest councils
only 78% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Greenwich decision statistics
Based on MHCLG data, the year to March 2026
77%
Overall approval rate
Below avg (87%) #278 of 296
78%
Householder approved
Below avg (90%) #287 of 296
75%
Decided in 8 weeks
Above avg (63%) #76 of 296
29%
Extended time limit
Below avg (41%) #49 of 296
60%
Minor dwellings approved
114 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
66%
Change of use approved
195 decided
1,468
Total decisions
331 refused in the year to March 2026