Land at The Platform Company, Amberley Way, Hounslow, TW4 6BH Data via plota.co.uk

P/2026/1875 - PF-Full Applications REGISTERED: Under Assessment

Proposal

Retrospective application for the construction and operation of a wet waste treatment process unit including access, parking and gates Data via plota.co.uk

View original council record ↗Last checked

Application progress

Validated
17 Jul 2026
Received
20 Jul 2026
Decision
Expected by 11 Sept 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 14 Sept 2026, from Hounslow's recent commercial and major works. The consultation period closed on 10 Aug 2026.

Documents 27

All documents on the council site ↗

Site constraints 8

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
Change of use or development that would result in new dwellings (Class MA/ZA). Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Strategic industrial land
Reserved for industry and logistics.
The London Plan protects strategic industrial locations from other uses; release needs a plan-led process.
Air quality management area: Hounslow AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Hounslow built-up area; Green belt 37 m away: London; Priority habitat 30 m away: Deciduous woodland.
Not affected
No listed building at the site · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hounslow - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hounslow
Application type
PF-Full Applications
Postcode
TW4 6BH
Received
20 Jul 2026
Validated
17 Jul 2026
Ward
Cranford
Case officer
Show
Applicant
Show

Decision outlook

Day 59, past the statutory target. 86% of commercial and major works in Hounslow are decided within thirteen weeks, which runs to 16 Oct 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 12 Sept 2026.

Day 593 days past the 56-day target
52%decided within 8 weeks
72%approved
29decided in the last year

Plota live figures for commercial and major works decided by Hounslow in the last twelve months, from validation. Hounslow decision record →

Consultation & key dates

Consultation
20 Jul 2026
Comments by
10 Aug 2026
Statutory expiry
11 Sept 2026
Hounslow
Planning Authority Score
2.1/10
Poor
#268 of 296 councils
Relevant to this application:
Householder decisions

Hounslow is slower than most councils at deciding householder applications, ranking #203 out of 296. 47% of applications have the time limit extended, above the 41% national average. Hounslow is also one of the strictest councils - it refuses more householder applications than almost any other, with only 75% approved vs 90% nationally.

One of the strictest councils
only 75% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Hounslow decision statistics
Based on MHCLG data, the year to March 2026
71%
Overall approval rate
Below avg (87%) #294 of 296
75%
Householder approved
Below avg (90%) #293 of 296
56%
Decided in 8 weeks
Below avg (63%) #203 of 296
47%
Extended time limit
Above avg (41%) #208 of 296
38%
Minor dwellings approved
82 decided (1-9 homes)
93%
Major dwellings approved
14 decided (10+ homes)
29%
Change of use approved
72 decided
1,191
Total decisions
340 refused in the year to March 2026