26/00891/ELECN - Electricity Generating Stations and Over No Objection

Proposal

Consent under Section 37 of the Electricity Act 1989 to upgrade 5 spans (392m) of the existing overhead high voltage network (11kv) from single to three phase by adding an additional cable in between the existing two cables Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Jun 2026
Decision
Target date was 25 Aug 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 24 Nov 2026; it is now day 147.

The consultation period closed on 10 Aug 2026.

Documents 5

Consultation & comments 1

PDF Commenter’s name hidden Show Consultee Comment · 7 Aug 2026 View ↗

All documents on the council site ↗

Site constraints 3

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area111 m² (1,195 sq ft)
Energy ratingD (63 out of 100)
PropertyMid-terrace house, 3 habitable rooms
Built2003 to 2006
HeatingBoiler and radiators, LPG
WallsCavity wall, as built, insulated (assumed)

From the energy performance certificate lodged in December 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Isle of Wight - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Electricity Generating Stations and Over
Postcode
PO30 2NB
Received
30 Jun 2026
Validated
30 Jun 2026
Ward
Fairlee And Whippingham
Parish
Newport & Carisbrooke Community Council
Case officer
Show
Decision level
Planning Officer Delegated Decision
Applicant
Show
Agent
Mark Wyles

Decision outlook

Day 147, past the statutory target. 96% of utility and infrastructure works in Isle of Wight are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 19 Nov 2026.

Day 14791 days past the 56-day target
65%decided within 8 weeks
92%approved
29decided in the last year

Plota live figures for utility and infrastructure works decided by Isle of Wight in the last twelve months, from validation. Isle of Wight decision record →

Public comments

No public comments yet.

Last counted 19 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
10 Aug 2026
Statutory expiry
25 Aug 2026
Env. assessment
No
Isle of Wight
Planning Authority Score
8.9/10
Excellent
#7 of 296 overall
Relevant to this application:
Householder decisions

Isle of Wight is one of the fastest councils in England for householder decisions: #11 of 296 on speed. Only 15% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Isle of Wight decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #84 of 296
95%
Householder approved
Above avg (90%) #81 of 296
92%
Decided in 8 weeks
Above avg (63%) #11 of 296
15%
Extended time limit
Below avg (41%) #11 of 296
84%
Minor dwellings approved
144 decided (1-9 homes)
67%
Major dwellings approved
18 decided (10+ homes)
94%
Change of use approved
34 decided
792
Total decisions
63 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.