8 Southwood Drive Bristol BS9 2QZ Data via plota.co.uk

25/13070/F - Full Planning Pending consideration

Proposal

Application for the change of use of a house (C3a), to a children's home, for up to two children, with a manager and up to two carers (C2). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Jul 2025
Decision
Target date was 26 Sept 2025

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 30 Jun 2026; it is now day 500.

The consultation period closed on 30 Jun 2026.

Documents 33

All documents on the council site ↗

Site constraints 6

Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Conservation area 13 m away: Sea Mills
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
Registered park or garden 133 m away: Kings Weston House; National infrastructure project 1.5 km away: Portishead Branch Line - MetroWest Phase 1; Inside the Bristol built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 8 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area125 m² (1,345 sq ft)
Energy ratingD (68 out of 100), could reach B
PropertySemi-detached house, 5 habitable rooms
Built1930 to 1949
HeatingBoiler and radiators, mains gas
WallsCavity wall, as built, no insulation (assumed)

From the energy performance certificate lodged in October 2022, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Bristol - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bristol
Application type
Full Planning
Postcode
BS9 2QZ
Received
11 Jul 2025
Validated
11 Jul 2025
Ward
Avonmouth & Lawrence Weston
Parish
Avonmouth And Lawrence Weston
Target decision
26 Sept 2025
Applicant
Show
Agent
Rose Consulting

Decision outlook

Day 500, past the statutory target. 73% of full applications in Bristol are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 16 Nov 2026.

Day 500444 days past the 56-day target
45%decided within 8 weeks
77%approved
518decided in the last year

Plota live figures for full applications decided by Bristol in the last twelve months, from validation. Bristol decision record →

Public comments

4comments received
4 objecting

100% object · above the UK average of 74%

6 neighbours consulted · Last counted 16 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14132817
Planning Portal ref
PP-14132817
Comments by
30 Jun 2026
Statutory expiry
5 Sept 2025
Bristol
Planning Authority Score
5.8/10
Average
#109 of 296 overall
Relevant to this application:
Change of use

Bristol is #112 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Bristol decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #190 of 296
92%
Householder approved
Above avg (90%) #149 of 296
71%
Decided in 8 weeks
Above avg (63%) #112 of 296
37%
Extended time limit
Below avg (41%) #118 of 296
74%
Minor dwellings approved
374 decided (1-9 homes)
93%
Major dwellings approved
30 decided (10+ homes)
82%
Change of use approved
150 decided
2,098
Total decisions
293 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.