St Williams College College Street York YO1 7JF Data via plota.co.uk

25/02477/LBC - Listed Building Consent Approved

Proposal

Variation of condition 2 of permitted application to alter the approved plans and elevations Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Dec 2025
✓
Validated
12 Dec 2025
✓
Approved
6 Feb 2026

Approved on 6 Feb 2026 · Delegated Decision · Last checked 3 Oct 2026

Documents 183

Plans & drawings 162

PDF CONSERVATION MANAGEMENT PLAN Report · 11 Dec 2025 View ↗ PDF LOCATION PLAN Location Plan · 11 Dec 2025 View ↗ PDF EXISTING SITE PLAN Drawing · 11 Dec 2025 View ↗ PDF EXISTING BASEMENT FLOOR PLAN Drawing · 11 Dec 2025 View ↗ PDF EXISTING GROUND FLOOR PLAN Drawing · 11 Dec 2025 View ↗ PDF EXISTING FIRST FLOOR PLAN Drawing · 11 Dec 2025 View ↗ PDF EXISTING ROOF PLAN Drawing · 11 Dec 2025 View ↗ PDF EXISTING SECOND FLOOR PLAN Drawing · 11 Dec 2025 View ↗ PDF EXISTING SECTION A Drawing · 11 Dec 2025 View ↗ PDF EXISTING SECTION B Drawing · 11 Dec 2025 View ↗ PDF EXISTING SECTION C Drawing · 11 Dec 2025 View ↗ PDF EXISTING SECTION D1 & D2 Drawing · 11 Dec 2025 View ↗ PDF EXISTING SECTION E F & H Drawing · 11 Dec 2025 View ↗ PDF EXISTING SECTION G Drawing · 11 Dec 2025 View ↗ PDF EXISTING SECTION D3 Drawing · 11 Dec 2025 View ↗ PDF EXISTING SECTION J Drawing · 11 Dec 2025 View ↗ PDF EXISTING SOUTH ELEVATION Drawing · 11 Dec 2025 View ↗ PDF EXISTING EAST ELEVATION Drawing · 11 Dec 2025 View ↗ PDF EAST ELEVATION PROPOSED Drawing · 11 Dec 2025 View ↗ PDF NORTH ELEVATION PROPOSED Drawing · 11 Dec 2025 View ↗ PDF NORTH STAIR ELEVATION PROPOSED Drawing · 11 Dec 2025 View ↗ PDF NW ELEVATION WINDOWS VENTS TYPICAL DETAIL Drawing · 11 Dec 2025 View ↗ PDF PROPOSED DOOR TYPES Drawing · 11 Dec 2025 View ↗ PDF TYPICAL DOOR DETAIL Drawing · 11 Dec 2025 View ↗ PDF TYPICAL FIRE DOOR Drawing · 11 Dec 2025 View ↗ PDF COURTYARD EAST & WEST ELEVATIONS PROPOSED Drawing · 11 Dec 2025 View ↗ PDF COURTYARD NORTH ELEVATION PROPOSED Drawing · 11 Dec 2025 View ↗ PDF PROPOSED SECTION/ELEVATION THROUGH ENTRY PASSAGEWAY Drawing · 11 Dec 2025 View ↗ PDF HOUSE OF LAYMAN FF.N.01 STAIR PLAN Drawing · 11 Dec 2025 View ↗ PDF HOUSE OF LAYMAN PARTITION TO SOUTH Drawing · 11 Dec 2025 View ↗ PDF PROPOSED GLAZED PARTITIONS TO OFFICES Drawing · 11 Dec 2025 View ↗ PDF GROUND FLOOR - WINDOW TYPES Drawing · 11 Dec 2025 View ↗ PDF FIRST FLOOR - WINDOW TYPES Drawing · 11 Dec 2025 View ↗ PDF SECOND FLOOR - WINDOW TYPES Drawing · 11 Dec 2025 View ↗ PDF PROPOSED WINDOW TYPES Drawing · 11 Dec 2025 View ↗ PDF EXISTING NORTH ELEVATION Drawing · 11 Dec 2025 View ↗ PDF EXISTING NORTH STAIRCASE ELEVATION Drawing · 11 Dec 2025 View ↗ PDF EXISTING WEST ELEVATION Drawing · 11 Dec 2025 View ↗ PDF EXISTING COURTYARD SOUTH ELEVATION Drawing · 11 Dec 2025 View ↗ PDF EXISTING COURTYARD EAST & WEST ELEVATIONS Drawing · 11 Dec 2025 View ↗ PDF EXISTING COURTYARD NORTH ELEVATION Drawing · 11 Dec 2025 View ↗ PDF EXISTING SECTION/ELEVATION THROUGH ENTRY PASSAGEWAY Drawing · 11 Dec 2025 View ↗ PDF PROPOSED BASEMENT PLAN Drawing · 11 Dec 2025 View ↗ PDF PROPOSED GROUND FLOOR PLAN Drawing · 11 Dec 2025 View ↗ PDF PROPOSED FIRST FLOOR PLAN Drawing · 11 Dec 2025 View ↗ PDF PROPOSED SECOND FLOOR PLAN Drawing · 11 Dec 2025 View ↗ PDF ROOF PLAN Drawing · 11 Dec 2025 View ↗ PDF SECTION A PROPOSED Drawing · 11 Dec 2025 View ↗ PDF SECTION B PROPOSED Drawing · 11 Dec 2025 View ↗ PDF SECTION C PROPOSED Drawing · 11 Dec 2025 View ↗ PDF SECTION D1 D2 PROPOSED Drawing · 11 Dec 2025 View ↗ PDF SECTION E F H PROPOSED Drawing · 11 Dec 2025 View ↗ PDF SECTION G PROPOSED Drawing · 11 Dec 2025 View ↗ PDF SECTION D3 PROPOSED Drawing · 11 Dec 2025 View ↗ PDF SECTION J PROPOSED Drawing · 11 Dec 2025 View ↗ PDF SOUTH ELEVATION PROPOSED Drawing · 11 Dec 2025 View ↗ PDF WEST ELEVATION PROPOSED Drawing · 11 Dec 2025 View ↗ PDF COURTYARD SOUTH ELEVATION PROPOSED Drawing · 11 Dec 2025 View ↗ PDF MOUSEMAN DOOR DGF.S12.1 Drawing · 11 Dec 2025 View ↗ PDF DOOR DFFN021 Drawing · 11 Dec 2025 View ↗ PDF DOOR DGFW061 Drawing · 11 Dec 2025 View ↗ PDF DOOR DFN051 Drawing · 11 Dec 2025 View ↗ PDF PROPOSED RAMP TO GROUND FLOOR N.12 RECEPTION Drawing · 11 Dec 2025 View ↗ PDF EXISTING FIRST FLOOR PLAN FF.S.01 LOBBY Drawing · 11 Dec 2025 View ↗ PDF PROPOSED GROUND FLOOR PLAN GF.S.01 LOBBY Drawing · 11 Dec 2025 View ↗ PDF PROPOSED FIRST FLOOR PLAN FF.S.01 LOBBY Drawing · 11 Dec 2025 View ↗ PDF EXISTING GROUND FLOOR PLAN GF.S.01 LOBBY Drawing · 11 Dec 2025 View ↗ PDF SECTION D1 GF.S.01 & FF.S.01 LOBBY Drawing · 11 Dec 2025 View ↗ PDF SECTION D2 GF.S.01 & FF.S.01 LOBBY Drawing · 11 Dec 2025 View ↗ PDF SECTION D3 GF.S.01 & FF.S.01 LOBBY Drawing · 11 Dec 2025 View ↗ PDF PROPOSED COURTYARD KEY PLAN Drawing · 11 Dec 2025 View ↗ PDF PROPOSED COURTYARD KEY SECTIONS Drawing · 11 Dec 2025 View ↗ PDF TEMPLE MOORE STAIRS Drawing · 11 Dec 2025 View ↗ PDF PROPOSED BASEMENT FLOOR PLAN-NORTH - WALLS, CEILING, FLOORS & JOINERY Drawing · 11 Dec 2025 View ↗ PDF PROPOSED BASEMENT FLOOR PLAN-SOUTH - WALLS, CEILING, FLOORS & JOINERY Drawing · 11 Dec 2025 View ↗ PDF PROPOSED GROUND FLOOR PLAN-NORTH - WALLS Drawing · 11 Dec 2025 View ↗ PDF PROPOSED GROUND FLOOR PLAN-SOUTH - WALLS Drawing · 11 Dec 2025 View ↗ PDF PROPOSED FIRST FLOOR PLAN-NORTH - WALLS Drawing · 11 Dec 2025 View ↗ PDF PROPOSED FIRST FLOOR PLAN-SOUTH - WALLS Drawing · 11 Dec 2025 View ↗ PDF PROPOSED SECOND FLOOR PLAN-NORTH - WALLS Drawing · 11 Dec 2025 View ↗ PDF PROPOSED SECOND FLOOR PLAN-SOUTH - WALLS Drawing · 11 Dec 2025 View ↗ PDF PROPOSED GROUND FLOOR PLAN-NORTH - FLOORS Drawing · 11 Dec 2025 View ↗ PDF PROPOSED GROUND FLOOR PLAN-SOUTH - FLOORS Drawing · 11 Dec 2025 View ↗ PDF PROPOSED FIRST FLOOR PLAN-NORTH - FLOORS Drawing · 11 Dec 2025 View ↗ PDF PROPOSED FIRST FLOOR PLAN-SOUTH - FLOORS Drawing · 11 Dec 2025 View ↗ PDF PROPOSED SECOND FLOOR PLAN-NORTH - FLOORS Drawing · 11 Dec 2025 View ↗ PDF PROPOSED SECOND FLOOR PLAN-SOUTH - FLOORS Drawing · 11 Dec 2025 View ↗ PDF PROPOSED GROUND FLOOR PLAN-NORTH - CEILINGS Drawing · 11 Dec 2025 View ↗ PDF PROPOSED GROUND FLOOR PLAN-SOUTH - CEILINGS Drawing · 11 Dec 2025 View ↗ PDF PROPOSED FIRST FLOOR PLAN-NORTH - CEILINGS Drawing · 11 Dec 2025 View ↗ PDF PROPOSED FIRST FLOOR PLAN-SOUTH - CEILINGS Drawing · 11 Dec 2025 View ↗ PDF PROPOSED SECOND FLOOR PLAN-NORTH - CEILINGS Drawing · 11 Dec 2025 View ↗ PDF PROPOSED SECOND FLOOR PLAN-SOUTH - CEILINGS Drawing · 11 Dec 2025 View ↗ PDF PROPOSED GROUND FLOOR PLAN-NORTH - JOINERY Drawing · 11 Dec 2025 View ↗ PDF PROPOSED GROUND FLOOR PLAN-SOUTH - JOINERY Drawing · 11 Dec 2025 View ↗ PDF PROPOSED FIRST FLOOR PLAN-NORTH - JOINERY Drawing · 11 Dec 2025 View ↗ PDF PROPOSED FIRST FLOOR PLAN-SOUTH - JOINERY Drawing · 11 Dec 2025 View ↗ PDF PROPOSED SECOND FLOOR PLAN-NORTH - JOINERY Drawing · 11 Dec 2025 View ↗ PDF PROPOSED SECOND FLOOR PLAN-SOUTH - JOINERY Drawing · 11 Dec 2025 View ↗ PDF BASEMENT PLAN PROPOSED FIRE STRATEGY Drawing · 11 Dec 2025 View ↗ PDF GROUND FLOOR PLAN PROPOSED FIRE STRATEGY Drawing · 11 Dec 2025 View ↗ PDF FIRST FLOOR PLAN PROPOSED FIRE STRATEGY Drawing · 11 Dec 2025 View ↗ PDF SECOND FLOOR PLAN PROPOSED FIRE STRATEGY Drawing · 11 Dec 2025 View ↗ PDF ARCHAEOLOGICAL ANALYSIS OF ORIGINAL PLAN Report · 11 Dec 2025 View ↗ PDF PROPOSED LV DISTRIBUTION SCHEMATIC Drawing · 11 Dec 2025 View ↗ PDF GROUND FLOOR PROPOSED SMALL POWER & DATA Drawing · 11 Dec 2025 View ↗ PDF FIRST FLOOR PROPOSED SMALL POWER & DATA Drawing · 11 Dec 2025 View ↗ PDF SECOND FLOOR PROPOSED SMALL POWER & DATA Drawing · 11 Dec 2025 View ↗ PDF GROUND FLOOR PROPOSED LIGHTING LAYOUT Drawing · 11 Dec 2025 View ↗ PDF FIRST FLOOR PROPOSED LIGHTING LAYOUT Drawing · 11 Dec 2025 View ↗ PDF SECOND FLOOR PROPOSED LIGHTING LAYOUT Drawing · 11 Dec 2025 View ↗ PDF GROUND FLOOR PROPOSED LV DISTRIBUTION STRATEGY & CONTAINMENT ROUTES Drawing · 11 Dec 2025 View ↗ PDF FIRST FLOOR PROPOSED LV DISTRIBUTION STRATEGY & CONTAINMENT ROUTES Drawing · 11 Dec 2025 View ↗ PDF SECOND FLOOR PROPOSED LV DISTRIBUTION STRATEGY & CONTAINMENT ROUTES Drawing · 11 Dec 2025 View ↗ PDF GROUND FLOOR FIRE DETECTION & ALARM LAYOUT Drawing · 11 Dec 2025 View ↗ PDF FIRST FLOOR FIRE DETECTION & ALARM STRATEGY Drawing · 11 Dec 2025 View ↗ PDF SECOND FLOOR FIRE DETECTION & ALARM STRATEGY Drawing · 11 Dec 2025 View ↗ PDF GROUND FLOOR PROPOSED SECURITY SYSTEMS Drawing · 11 Dec 2025 View ↗ PDF FIRST FLOOR PROPOSED SECURITY LAYOUT Drawing · 11 Dec 2025 View ↗ PDF SECOND FLOOR PROPOSED SECURITY SYSTEMS Drawing · 11 Dec 2025 View ↗ PDF GROUND FLOOR PROPOSED COMBINED SERVICES RECEPTION Drawing · 11 Dec 2025 View ↗ PDF FIRST FLOOR PROPOSED COMBINED SERVICES BISHOP'S CHAMBER & MACLAGEN HALL Drawing · 11 Dec 2025 View ↗ PDF FIRST FLOOR PROPOSED COMBINED SERVICES HOUSE OF LAYMAN Drawing · 11 Dec 2025 View ↗ PDF SECOND FLOOR PROPOSED COMBINED SERVICES GALLERY SPACES Drawing · 11 Dec 2025 View ↗ PDF GROUND LEVEL EXISTING LV DISTRIBUTION SYSTEM Drawing · 11 Dec 2025 View ↗ PDF FIRST FLOOR EXISTING LV DISTRIBUTION SYSTEM Drawing · 11 Dec 2025 View ↗ PDF SECOND FLOOR EXISTING LV DISTRIBUTION SYSTEM Drawing · 11 Dec 2025 View ↗ PDF BASEMENT LEVEL EXISTING LV DISTRIBUTION SYSTEM Drawing · 11 Dec 2025 View ↗ PDF GROUND FLOOR STRIP OUT LAYOUT Drawing · 11 Dec 2025 View ↗ PDF FIRST FLOOR STRIP OUT LAYOUT Drawing · 11 Dec 2025 View ↗ PDF SECOND FLOOR STRIP OUT LAYOUT Drawing · 11 Dec 2025 View ↗ PDF BASEMENT LEVEL STRIP OUT LAYOUT Drawing · 11 Dec 2025 View ↗ PDF GROUND FLOOR DOMESTIC WATER SERVICES Drawing · 11 Dec 2025 View ↗ PDF FIRST FLOOR DOMESTIC WATER SERVICES Drawing · 11 Dec 2025 View ↗ PDF SECOND FLOOR DOMESTIC WATER SERVICES Drawing · 11 Dec 2025 View ↗ PDF BASEMENT LEVEL DOMESTIC WATER SERVICES Drawing · 11 Dec 2025 View ↗ PDF DOMESTIC WATER SERVICES SCHEMATIC Drawing · 11 Dec 2025 View ↗ PDF GROUND FLOOR GAS SERVICES Drawing · 11 Dec 2025 View ↗ PDF GROUND FLOOR COOLING SERVICES Drawing · 11 Dec 2025 View ↗ PDF FIRST FLOOR COOLING SERVICES Drawing · 11 Dec 2025 View ↗ PDF GROUND FLOOR HEATING SERVICES Drawing · 11 Dec 2025 View ↗ PDF FIRST FLOOR HEATING SERVICES Drawing · 11 Dec 2025 View ↗ PDF SECOND FLOOR HEATING SERVICES Drawing · 11 Dec 2025 View ↗ PDF HEATING SERVICES SCHEMATIC Drawing · 11 Dec 2025 View ↗ PDF GROUND FLOOR VENTILATION LAYOUT Drawing · 11 Dec 2025 View ↗ PDF FIRST FLOOR VENTILATION LAYOUT Drawing · 11 Dec 2025 View ↗ PDF SECOND FLOOR VENTILATION LAYOUT Drawing · 11 Dec 2025 View ↗ PDF ROOF LEVEL VENTILATION LAYOUT Drawing · 11 Dec 2025 View ↗ PDF GROUND FLOOR EXISTING SERVICES Drawing · 11 Dec 2025 View ↗ PDF FIRST FLOOR EXISTING SERVICES Drawing · 11 Dec 2025 View ↗ PDF SECOND FLOOR EXISTING SERVICES Drawing · 11 Dec 2025 View ↗ PDF BASEMENT LEVEL EXISTING SERVICES Drawing · 11 Dec 2025 View ↗ PDF BOILER HOUSE SCHEMATIC Drawing · 11 Dec 2025 View ↗ PDF BASEMENT PLAN - PROPOSED REPAIRS Drawing · 11 Dec 2025 View ↗ PDF GROUND FLOOR PLAN - PROPOSED REPAIRS Drawing · 11 Dec 2025 View ↗ PDF FIRST FLOOR PLAN - PROPOSED REPAIRS Drawing · 11 Dec 2025 View ↗ PDF SECOND FLOOR PLAN - PROPOSED REPAIRS Drawing · 11 Dec 2025 View ↗ PDF PROPOSED REPAIRS DETAILS - SHEET 1 OF 3 Drawing · 11 Dec 2025 View ↗ PDF PROPOSED REPAIRS DETAILS - SHEET 2 OF 3 Drawing · 11 Dec 2025 View ↗ PDF PROPOSED REPAIRS DETAILS - SHEET 3 OF 3 Drawing · 11 Dec 2025 View ↗ PDF GROUND FLOOR, SECTIONS & DETAILS SHEET 1 Drawing · 11 Dec 2025 View ↗ PDF LIFT ELEVATIONS SHEET 1 Drawing · 11 Dec 2025 View ↗

All documents on the council site ↗

Associated applications 3

Site constraints 6

Scheduled monument: York Minster cathedral precinct: including Bootham Bar and the length of City Walls extending round the precinct up to Monk Bar
Scheduled monument consent is needed for any work to it, separate from planning permission.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Grade II listed: 8, 9 and 10, College Street
List entry 1259193 · 21 m away · 75 more listed buildings within 150 m (6 Grade I, 13 Grade II*, 56 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 75 with distances
Historic England ↗
Central Historic Core Conservation Area conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Article 4 direction
HMO. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Also on the record
Inside the York built-up area; Air quality management area 91 m away: AQMA No.5.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in York - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
York
Application type
Listed Building Consent
Postcode
YO1 7JF
Received
11 Dec 2025
Validated
12 Dec 2025
Ward
Guildhall
Parish
Guildhall Planning Panel
Case officer
Show
Target decision
6 Feb 2026
Decision
Approve
Decision date
6 Feb 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Savills

Public comments

2comments received
1 neutral1 supporting

1 neighbour consulted · Last counted 3 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14558158
Planning Portal ref
PP-14558158
Comments by
28 Jan 2026
Statutory expiry
6 Feb 2026
Env. assessment
No
York
Planning Authority Score
3.7/10
Below average
#213 of 296 councils
Relevant to this application:
Other decisions

York ranks #156 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
York decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #255 of 296
87%
Householder approved
Below avg (90%) #237 of 296
64%
Decided in 8 weeks
Above avg (63%) #156 of 296
42%
Extended time limit
Above avg (41%) #168 of 296
69%
Minor dwellings approved
104 decided (1-9 homes)
71%
Major dwellings approved
17 decided (10+ homes)
63%
Change of use approved
68 decided
1,278
Total decisions
224 refused in the year to March 2026