Footpath Outside 14 Farnham Rd Harold Hill, Romford RM3 8DX Data via plota.co.uk

A0041.26 Undecided

Proposal

2 x Internally illuminated Digital LCD Display Screens Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Nov 2026
✓
Validated
9 Nov 2026
Decision
Expected by 4 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 11 Jan 2027 and 23 Jan 2027, from Havering's recent signs and adverts.

Site constraints 5

Air quality management area: Havering AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Public footpath about 21 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Town centre: Harold Hill
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Also on the record
Inside the Havering built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Havering - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Havering
Postcode
RM3 8DX
Received
2 Nov 2026
Validated
9 Nov 2026
Ward
Heaton
Case officer
Show
Target decision
4 Jan 2027
Applicant
Show

Decision outlook

Day 14 of the 56-day target. Havering usually decides signs and adverts by day 66.

Day 1452 days to the predicted decision (day 66)
32%decided within 8 weeks
93%approved
31decided in the last year

Plota live figures for signs and adverts decided by Havering in the last twelve months, from validation. Havering decision record →

Havering
Planning Authority Score
2.5/10
Poor
#251 of 296 overall
Relevant to this application:
Householder decisions

Havering is slower than most councils at deciding householder applications: #202 of 296 on speed. 47% of applications have the time limit extended, above the 41% national average. Havering is also one of the strictest councils - it refuses more householder applications than almost any other, with only 83% approved vs 90% nationally.

One of the strictest councils
only 83% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Havering decision statistics
Based on MHCLG data, the year to March 2026
74%
Overall approval rate
Below avg (87%) #290 of 296
83%
Householder approved
Below avg (90%) #262 of 296
56%
Decided in 8 weeks
Below avg (63%) #202 of 296
47%
Extended time limit
Above avg (41%) #207 of 296
42%
Minor dwellings approved
156 decided (1-9 homes)
83%
Major dwellings approved
12 decided (10+ homes)
29%
Change of use approved
101 decided
1,501
Total decisions
385 refused in the year to March 2026