Land North East Of M6 J23 Haydock Point St Helens Data via plota.co.uk

Proposal

Outline planning application, with all matters reserved except for access from the A580 and A49, for the development of employment floorspace for manufacturing and distribution uses with ancillary offices (Use Classes B2 and B8), together with food and drink uses (Use Class E(b) and sui generis drive-through), leisure/health and fitness uses (Use Classes E(d) and F2(c)), crèche use (Use Class E(f)), a sustainable/alternative fuel hub for HGVs with associated welfare facilities, car and HGV parking, landscaping, site profiling, and associated highways, drainage and utilities infrastructure. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Oct 2026
✓
Consultation
19 Nov 2026
Decision
Target date was 11 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 16 Dec 2026 and 31 Dec 2026, from Wigan's recent utility and infrastructure works.

Comments are open until 10 Dec 2026

Comment on this application ↗

Site constraints 9

Green belt: Merseyside and Greater Manchester
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Air quality management area: M6 AQMA No.1
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Public footpath 25 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Scheduled monument 175 m away: Castle Hill motte and bailey and bowl barrow; Coalfield, development low risk area; National infrastructure project 845 m away: Intermodal Logistics Park North, at pre-application; Priority habitat 37 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site

Checked on 22 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Looking for land for a drive-thru?

Plota Sites searches every land parcel in England and Wales: 1,691 sites fit this search. On and off the market, free to search.

Land for drive-thrus
Work with planning data?

Every application in Wigan - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wigan
Application type
Neighbouring LA
Received
21 Oct 2026
Validated
21 Oct 2026
Ward
Wigan Central
Parish
Wigan North
Case officer
Show
Target decision
11 Nov 2026
Applicant
Show

Decision outlook

Day 33 of the 56-day target. Wigan usually decides utility and infrastructure works by day 56.

Day 3323 days to the 56-day target
52%decided within 8 weeks
96%approved
29decided in the last year

Plota live figures for utility and infrastructure works decided by Wigan in the last twelve months, from validation. Wigan decision record →

Public comments

No public comments yet.

Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
P/2026/0542/OUP
Consultation
19 Nov 2026
Comments by
10 Dec 2026
Statutory expiry
11 Nov 2026
Env. assessment
No
Wigan
Planning Authority Score
2/10
Poor
#273 of 296 overall
Relevant to this application:
Householder decisions

Wigan is slower than most councils at deciding householder applications: #216 of 296 on speed. The council extends the time limit on 57% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Wigan decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #213 of 296
87%
Householder approved
Below avg (90%) #236 of 296
54%
Decided in 8 weeks
Below avg (63%) #216 of 296
57%
Extended time limit
Above avg (41%) #262 of 296
70%
Minor dwellings approved
69 decided (1-9 homes)
94%
Major dwellings approved
16 decided (10+ homes)
60%
Change of use approved
50 decided
708
Total decisions
109 refused in the year to March 2026