4 - 5 Market Chambers Church Street Enfield EN2 6AA Data via plota.co.uk

26/03660/ADV - Advertisement Consent Approved

Proposal

Replacement of existing externally illuminated fascia signage with 1 no. externally (Halo) illuminated letterset and 1 no. illuminated golden underscore, together with the relocation and redecoration of the existing internally illuminated projecting sign. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 Aug 2026
✓
Consultation
4 Sept 2026
✓
Approved
23 Oct 2026

Approved on 23 Oct 2026 · Delegated Decision · Last checked 23 Oct 2026

Site constraints 10

Enfield Town conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
2 Article 4 directions
Enfield Town · Borough wide. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Heritage at risk: Enfield Town
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
Archaeological priority area: Archaeological Priority Area surrounding the historic core of Enfield
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Enfield AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Enfield Town
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Also on the record
9 listed buildings within 150 m; Inside the Enfield built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square; Metropolitan Open Land 47 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area606 m² (6,523 sq ft)
Energy ratingD (asset rating 78)
UseRestaurants and Cafes/Drinking Establishments/Takeaways
HeatingAir Conditioning

From the energy performance certificate lodged in September 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Enfield - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Enfield
Application type
Advertisement Consent
Postcode
EN2 6AA
Received
28 Aug 2026
Validated
28 Aug 2026
Ward
Town
Case officer
Show
Target decision
23 Oct 2026
Decision
Granted With Conditions
Decision date
23 Oct 2026
Decision level
Delegated Decision
Agent
Planware Limited
Freehold owner
Show

How this decision compares

Decided in 56 days from validation, 5 days slower than Enfield's median of 51 for signs and adverts. Approved, as 85% of signs and adverts here are.

90%decided within 8 weeks
85%approved
85decided in the last year

Plota live figures for signs and adverts decided by Enfield in the last twelve months, from validation. Enfield decision record →

Public comments

No public comments yet.

21 neighbours consulted · Last counted 23 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15191710
Planning Portal ref
PP-15191710
Neighbours
8 Sept 2026
Consultation
4 Sept 2026
Comments by
7 Oct 2026
Site or press notice
23 Sept 2026
Statutory expiry
23 Oct 2026
Env. assessment
No
Enfield
Planning Authority Score
6.9/10
Good
#65 of 296 overall
Relevant to this application:
Other decisions

Enfield is one of the fastest councils in England for householder decisions: #15 of 296 on speed. Only 5% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Enfield is also one of the strictest councils - it refuses more householder applications than almost any other, with only 83% approved vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Enfield decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #271 of 296
83%
Householder approved
Below avg (90%) #260 of 296
90%
Decided in 8 weeks
Above avg (63%) #15 of 296
5%
Extended time limit
Below avg (41%) #1 of 296
60%
Minor dwellings approved
265 decided (1-9 homes)
63%
Major dwellings approved
8 decided (10+ homes)
72%
Change of use approved
322 decided
1,939
Total decisions
433 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Freehold owner and leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.