Tesco Bocholt Way Rawtenstall Rossendale Lancashire BB4 6DT Data via plota.co.uk

2026/0264 - Full Application Approved

Proposal

Proposed 2x DT Dual Temperature Pack and 2x GC Remote Gas Cooler to be installed on 150mm high concrete plinth, new 1.1 m high Armco barrier surrounding the plant units. Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
10 Jul 2026
Validated
23 Jul 2026
Consultation
24 Jul 2026
Approved
3 Sept 2026

Approved on 3 Sept 2026 · Delegated Decision · Last checked 3 Sept 2026

Site constraints 7

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
Immediate Article 4 Direction for small Houses in Multiple Occupation. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Also on the record
Conservation area 65 m away: Rawtenstall Conservation Area; Heritage at risk 65 m away: Rawtenstall Town Centre, Rossendale; Inside the Rawtenstall built-up area; Priority habitat 42 m away: Deciduous woodland; the 1970s provisional farmland map had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Rossendale - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Rossendale
Application type
Full Application
Postcode
BB4 6DT
Received
10 Jul 2026
Validated
23 Jul 2026
Ward
Longholme
Case officer
Show
Target decision
17 Sept 2026
Decision
Approve with Conditions
Decision date
3 Sept 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Tesco Business Solutions

How this decision compares

Decided in 42 days from validation, 21 days faster than Rossendale's median of 63 for full applications. Approved, as 91% of full applications here are.

37%decided within 8 weeks
91%approved
36decided in the last year

Plota live figures for full applications decided by Rossendale in the last twelve months, from validation. Rossendale decision record →

Public comments

No public comments yet.

Last counted 3 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15076493
Consultation
24 Jul 2026
Site or press notice
27 Jul 2026
Env. assessment
No
Rossendale
Planning Authority Score
1/10
Poor
#293 of 296 councils
Relevant to this application:
Householder decisions

Rossendale is one of the slowest councils in England for householder decisions, ranking #287 out of 296. The council extends the time limit on 75% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Rossendale decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #197 of 296
88%
Householder approved
Below avg (90%) #222 of 296
27%
Decided in 8 weeks
Below avg (63%) #287 of 296
75%
Extended time limit
Above avg (41%) #293 of 296
85%
Minor dwellings approved
34 decided (1-9 homes)
100%
Major dwellings approved
3 decided (10+ homes)
59%
Change of use approved
17 decided
231
Total decisions
33 refused in the year to March 2026