32 High Street Andover Hampshire SP10 1NT Data via plota.co.uk

26/02258/LBWN - LISTED BUILDING WORKS - NORTH Current

Proposal

External repair and redecoration of windows and doors and cleaning of brickwork on front elevation Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Oct 2026
✓
Validated
3 Nov 2026
✓
Consultation
4 Nov 2026
Decision
Expected by 29 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 28 Dec 2026, from Test Valley's recent extensions.

Comments are open until 4 Dec 2026

Comment on this application ↗

Site constraints 5

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Andover conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Public footpath 11 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
20 listed buildings within 150 m
Nearest: 32, High Street, Grade II, 32 m away · 2 Grade II*, 18 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 20 with distances
Historic England ↗
Also on the record
Inside the Andover built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 5 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Test Valley - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
LISTED BUILDING WORKS - NORTH
Postcode
SP10 1NT
Received
13 Oct 2026
Validated
3 Nov 2026
Ward
ANDOVER ST MARYS
Parish
ANDOVER TOWN (ST MARYS)
Case officer
Show
Target decision
29 Dec 2026
Applicant
Show

Decision outlook

Day 15 of the 56-day target. Test Valley usually decides extensions by day 55.

Day 1541 days to the 56-day target
73%decided within 8 weeks
97%approved
513decided in the last year

Plota live figures for extensions decided by Test Valley in the last twelve months, from validation. Test Valley decision record →

Public comments

No public comments yet.

8 neighbours consulted · Last counted 12 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Neighbours
4 Nov 2026
Consultation
4 Nov 2026
Comments by
4 Dec 2026
Site or press notice
13 Nov 2026
Statutory expiry
29 Dec 2026
Env. assessment
No
Test Valley
Planning Authority Score
7.8/10
Good
#32 of 296 councils
Relevant to this application:
Other decisions

Test Valley is faster than most councils at deciding householder applications, ranking #71 out of 296. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Test Valley decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #68 of 296
96%
Householder approved
Above avg (90%) #62 of 296
76%
Decided in 8 weeks
Above avg (63%) #71 of 296
31%
Extended time limit
Below avg (41%) #61 of 296
70%
Minor dwellings approved
96 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
88%
Change of use approved
50 decided
996
Total decisions
72 refused in the year to March 2026