Plumstead Road Edgefield Norfolk Data via plota.co.uk

IB/25/2590 - Informal Bronze Decided

Proposal

Notification under Regulation 5 of the Electronic Communications Code (Conditions and restrictions) Regulations 2003 (as amended) of intention to install fixed line broadband electronic communications apparatus (6 X 9M light pole) Ref: WGNL5C1C Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Nov 2025
✓
Validated
20 Nov 2025
✓
Advice Given (for pre-apps)
27 Nov 2025

Advice Given (for pre-apps) on 27 Nov 2025 · Delegated Decision · Last checked 12 Oct 2026

Site constraints 6

Nutrient neutrality catchment: Bure Broads and Marshes
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project about 1 km away: Hornsea Project Three Offshore Wind Farm
The site is about 1 km from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Conservation area about 87 m away: Glaven Valley; Inside the Edgefield built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North Norfolk - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Informal Bronze
Received
19 Nov 2025
Validated
20 Nov 2025
Ward
Stody
Parish
Edgefield
Case officer
Show
Target decision
4 Dec 2025
Decision
Advice Given (for pre-apps)
Decision date
27 Nov 2025
Decision level
Delegated Decision
Applicant
Show

Public comments

No public comments yet.

Last counted 12 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
4 Dec 2025
Env. assessment
No
North Norfolk
Planning Authority Score
5.4/10
Average
#125 of 296 overall
Relevant to this application:
Householder decisions

North Norfolk is #175 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
North Norfolk decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #43 of 296
96%
Householder approved
Above avg (90%) #56 of 296
61%
Decided in 8 weeks
Below avg (63%) #175 of 296
44%
Extended time limit
Above avg (41%) #183 of 296
85%
Minor dwellings approved
113 decided (1-9 homes)
81%
Major dwellings approved
16 decided (10+ homes)
85%
Change of use approved
34 decided
906
Total decisions
56 refused in the year to March 2026