26/03074/CND - Discharge Condition Application in Progress

Proposal

Details submitted pursuant to ref: : fire statement (13), in respect of site alterations to include elevation alterations to warehouse, canopy extension, surface and boundary treatment, installation of ancillary infrastructure including gatehouse, new and extended smoking facilities, extended welfare facilities and unit for vehicle maintenance, alterations to lighting, electric vehicle charging infrastructure (part retrospective), and new waste storage facilities. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Jul 2026
✓
Consultation
27 Aug 2026
Decision
Expected by 14 Sept 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 17 Sept 2026; it is now day 81.

The consultation period closed on 17 Sept 2026.

Associated applications 7

Site constraints 10

Article 4 direction
Borough wide. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Strategic industrial land
Reserved for industry and logistics.
The London Plan protects strategic industrial locations from other uses; release needs a plan-led process.
Archaeological priority area: River valley deposits with high prehistoric and palaeonvironmental potential.
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Enfield AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 161 m away: North London (Electricity Line) Reinforcement
The site is 161 m from the project boundary. Electricity line, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI 193 m away: Chingford Reservoirs SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Enfield built-up area; Public transport access: PTAL 1a (very poor), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Enfield - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Enfield
Application type
Discharge Condition
Postcode
EN3 7PH
Received
20 Jul 2026
Validated
20 Jul 2026
Ward
Brimsdown
Case officer
Show
Target decision
14 Sept 2026
Decision level
Delegated Decision
Agent
DWDLTD

Decision outlook

Day 81, past the statutory target. 96% of commercial and major works in Enfield are decided within thirteen weeks, which runs to 19 Oct 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 8125 days past the 56-day target
81%decided within 8 weeks
81%approved
81decided in the last year

Plota live figures for commercial and major works decided by Enfield in the last twelve months, from validation. Enfield decision record →

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15076807
Planning Portal ref
PP-15076807
Consultation
27 Aug 2026
Comments by
17 Sept 2026
Statutory expiry
14 Sept 2026
Env. assessment
No
Enfield
Planning Authority Score
6.9/10
Good
#65 of 296 councils
Relevant to this application:
Householder decisions

Enfield is one of the fastest councils in England for householder decisions, ranking #15 out of 296. Only 5% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Enfield is also one of the strictest councils - it refuses more householder applications than almost any other, with only 83% approved vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Enfield decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #271 of 296
83%
Householder approved
Below avg (90%) #260 of 296
90%
Decided in 8 weeks
Above avg (63%) #15 of 296
5%
Extended time limit
Below avg (41%) #1 of 296
60%
Minor dwellings approved
265 decided (1-9 homes)
63%
Major dwellings approved
8 decided (10+ homes)
72%
Change of use approved
322 decided
1,939
Total decisions
433 refused in the year to March 2026