Unit 2 Delta Park Industrial Estate 120 Millmarsh Lane Enfield EN3 7QJ Data via plota.co.uk

26/03298/FUL - Full Application in Progress

Proposal

Erection of boundary fence and gates, together with installation of Electric Vehicle Charging Infrastructure comprising 3x charging terminals. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Aug 2026
✓
Validated
14 Aug 2026
✓
Consultation
21 Aug 2026
Decision
Expected by 9 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 56.

The consultation period closed on 18 Sept 2026.

Site constraints 12

Article 4 direction
Borough wide. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Strategic industrial land
Reserved for industry and logistics.
The London Plan protects strategic industrial locations from other uses; release needs a plan-led process.
Archaeological priority area: River valley deposits with high prehistoric and palaeonvironmental potential.
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Enfield AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 86 m away: North London (Electricity Line) Reinforcement
The site is 86 m from the project boundary. Electricity line, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI 101 m away: Chingford Reservoirs SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Enfield built-up area; Public transport access: PTAL 0 (very poor), TfL 2023, for the 100 m square; Green belt 46 m away: London; Flood defence 47 m away (natural high ground, designed for a 1 in 25 year flood).
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area1,641 m² (17,664 sq ft)
Energy ratingD (asset rating 77)
UseStorage or Distribution
HeatingAir Conditioning

From the energy performance certificate lodged in October 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Enfield - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Enfield
Application type
Full
Postcode
EN3 7QJ
Received
3 Aug 2026
Validated
14 Aug 2026
Ward
Brimsdown
Case officer
Show
Target decision
9 Oct 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Studio Arkell

Decision outlook

Day 56, past Enfield's usual 44 days for extensions. 99% are decided within thirteen weeks, so most likely by 13 Nov 2026.

Day 560 days to the 56-day target
90%decided within 8 weeks
82%approved
1,734decided in the last year

Plota live figures for extensions decided by Enfield in the last twelve months, from validation. Enfield decision record →

Public comments

No public comments yet.

6 neighbours consulted · Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15122804
Planning Portal ref
PP-15122804
Neighbours
25 Aug 2026
Consultation
21 Aug 2026
Comments by
18 Sept 2026
Statutory expiry
9 Oct 2026
Env. assessment
No
Enfield
Planning Authority Score
6.9/10
Good
#65 of 296 councils
Relevant to this application:
Householder decisions

Enfield is one of the fastest councils in England for householder decisions, ranking #15 out of 296. Only 5% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Enfield is also one of the strictest councils - it refuses more householder applications than almost any other, with only 83% approved vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Enfield decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #271 of 296
83%
Householder approved
Below avg (90%) #260 of 296
90%
Decided in 8 weeks
Above avg (63%) #15 of 296
5%
Extended time limit
Below avg (41%) #1 of 296
60%
Minor dwellings approved
265 decided (1-9 homes)
63%
Major dwellings approved
8 decided (10+ homes)
72%
Change of use approved
322 decided
1,939
Total decisions
433 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.