Unit 5, Howe Moss Place Kirkhill Industrial Estate Aberdeen AB21 0GS Data via plota.co.uk

261256/HAZ - Hazardous Substances Consent Pending

Proposal

Storage and use of various hazardous substances Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 2 Nov 2026
Decision
Expected by 1 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 28 Dec 2026 and 15 Jan 2027, from Aberdeen's recent utility and infrastructure works.

Site constraints 1

Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 4 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Aberdeen - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Aberdeen
Application type
Hazardous Substances Consent
Postcode
AB21 0GS
Received
around 2 Nov 2026
Validated
2 Nov 2026
Ward
Dyce/Bucksburn/Danestone
Parish
Dyce And Stoneywood
Target decision
1 Jan 2027
Applicant
Show

Decision outlook

Day 21 of the 56-day target. Aberdeen usually decides utility and infrastructure works by day 70.

Day 2149 days to the predicted decision (day 70)
41%decided within 8 weeks
97%approved
10%go to committee

Plota live figures for utility and infrastructure works decided by Aberdeen in the last twelve months, from validation. Aberdeen decision record →

Public comments

No public comments yet.

6 neighbours consulted · Last counted 17 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Site or press notice
11 Nov 2026
Statutory expiry
1 Jan 2027
Env. assessment
No