Unit 1, 168 Sevenoaks Way, Orpington, BR5 3AE Data via plota.co.uk
Proposal
Proposal for the installation of 4 rapid electric vehicle (EV) charging stations and associated ancillary equipment within the car park including the provision of one fully accessible EV charging bay Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. Plota predicts a decision by 3 Dec 2026, from Bromley's recent utility and infrastructure works.
Documents 20
Statements & assessments 7
Plans & drawings 6
Application forms 1
Other documents 6
Site constraints 5
Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Bromley - and every UK council - as a live feed, an API, or a bulk CSV export.
Other new applications on this street
79 SEVENOAKS WAY, ORPINGTON, BR5 3AG
Conversion and extension of existing garage to provide a home office. LAWFUL DEV...
34 SEVENOAKS WAY, ORPINGTON, BR5 3AF
Erection of outbuilding to rear garden for use as gym/office and store. LAWFUL ...
117 SEVENOAKS WAY, ORPINGTON, BR5 3AQ
Details submitted to comply with the requirements of the following conditions re...
1 GRAYS FARM COTTAGES, SEVENOAKS WAY, ORPINGTON, BR5 3JF
Construction of 2 x two storey detached dwellings with car parking, formation of...
Nearby new applications
CRAYFIELD INDUSTRIAL PARK, MAIN ROAD, ST PAULS CRAY, ORPINGTON, BR5 3HP
T1 Beech - Reduce lateral growth to the south of the tree by 3m leaving crown di...
25 BROOMWOOD ROAD, ORPINGTON, BR5 2JH
Retention of outbuilding as constructed and change of use from outbuilding for p...
79 SEVENOAKS WAY, ORPINGTON, BR5 3AG
Conversion and extension of existing garage to provide a home office. LAWFUL DEV...
34 SEVENOAKS WAY, ORPINGTON, BR5 3AF
Erection of outbuilding to rear garden for use as gym/office and store. LAWFUL ...
CRAYFIELD HOUSE, CRAYFIELD INDUSTRIAL PARK, MAIN ROAD, ST PAULS CRAY, ORPINGTON, BR5 3HP
2 externally Illuminated post mounted panel signs and 1 externally illuminated p...
CRAYFIELD HOUSE, CRAYFIELD INDUSTRIAL PARK, MAIN ROAD, ST PAULS CRAY, ORPINGTON, BR5 3HP
Under S73 of the Town and Country Planning Act 1990, variation of Condition 2 of...
Important details
Decision outlook
Day 69, past the statutory target. 85% of utility and infrastructure works in Bromley are decided within thirteen weeks, which runs to 15 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.
Plota live figures for utility and infrastructure works decided by Bromley in the last twelve months, from validation. Bromley decision record →
Public comments
No public comments yet.
Last counted 22 Nov 2026
Consultation & key dates
- Comments by
- 12 Oct 2026
Historical activity at this location
25 nearby applications on record - archival context, not part of the live application.
Nearby activity
Bromley is #143 of 296 councils on householder decision speed. Bromley is also one of the strictest councils - it refuses more householder applications than almost any other, with only 79% approved vs 90% nationally.
Track this application
Unit 1, 168 Sevenoaks Way, Orpington, BR5 3AE
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.

The consultation period closed on 12 Oct 2026.