Pinder Court King Street Tavistock PL19 0DS Data via plota.co.uk

2409/26/CLB - Certficate of Lawfulness for Proposed Works to a Listed Building Under Consideration

Proposal

Certificate of lawfulness for proposed works to a Listed Building for repairs or renewal of cast iron rainwater gutter and associated lead abutment as well as internal repairs to water damage Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 Aug 2026
✓
Validated
23 Sept 2026
Decision
Expected by 18 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 17 Nov 2026, from West Devon's recent listed building works.

Site constraints 7

58 listed buildings within 150 m of the postcode pin
Nearest: 5 and 6, King Street, Grade II, about 22 m from the postcode pin · 1 Grade II*, 57 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 58 with distances
Historic England ↗
World heritage site: Cornwall and West Devon Mining Landscape
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Tavistock conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Local nature reserve about 124 m away: Tavistock Viaduct Walk
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Scheduled monument about 134 m away: Tavistock Abbey
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Also on the record
Inside the Tavistock built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in West Devon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
West Devon
Application type
Certficate of Lawfulness for Proposed Works to a Listed Building
Postcode
PL19 0DS
Received
26 Aug 2026
Validated
23 Sept 2026
Ward
Tavistock North
Parish
Tavistock
Case officer
Show
Applicant
Show

Decision outlook

Day 16 of the 56-day target. West Devon usually decides listed building works by day 55.

Day 1640 days to the 56-day target
70%decided within 8 weeks
100%approved
27decided in the last year

Plota live figures for listed building works decided by West Devon in the last twelve months, from validation. West Devon decision record →