Unit 12 Four Ashes Industrial Estate Station Road Four Ashes Wolverhampton WV10 7DB Data via plota.co.uk

26/00964/LUP - Certificate of Lawfulness - proposed Awaiting decision

Proposal

Proposed use of Unit 12, Four Ashes Industrial Estate as an MOT testing bay Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Nov 2026
✓
Consultation
11 Nov 2026
Decision
Expected by 30 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 30 Dec 2026 and 18 Jan 2027, from South Staffordshire's recent changes of use.

Comments are open until 5 Dec 2026

Comment on this application ↗

Site constraints 4

National infrastructure project 134 m away: West Midlands Interchange
The site is 134 m from the project boundary. Rail freight interchange, decided. The project page says whether consent was granted. Also within 2 km: M54 to M6 Link Road (decided, 1.8 km).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
SSSI 442 m away: Four Ashes Pit SSSI; Inside the Four Ashes built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 12 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area317 m² (3,412 sq ft)
Energy ratingE (asset rating 118)
UseB1 Offices and Workshop businesses
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in October 2016, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in South Staffordshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Certificate of Lawfulness - proposed
Postcode
WV10 7DB
Received
4 Nov 2026
Validated
4 Nov 2026
Ward
Brewood, Coven & Blymhill
Parish
BREWOOD & COVEN
Case officer
Show
Target decision
30 Dec 2026
Applicant
Show

Decision outlook

Day 19 of the 56-day target. South Staffordshire usually decides changes of use by day 62.

Day 1943 days to the predicted decision (day 62)
41%decided within 8 weeks
68%approved
7%go to committee

Plota live figures for changes of use decided by South Staffordshire in the last twelve months, from validation. South Staffordshire decision record →

Public comments

No public comments yet.

Last counted 18 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15345376
Planning Portal ref
PP-15345376
Consultation
11 Nov 2026
Comments by
5 Dec 2026
Statutory expiry
30 Dec 2026
Env. assessment
No
South Staffordshire
Planning Authority Score
3.5/10
Below average
#220 of 296 overall
Relevant to this application:
Householder decisions

South Staffordshire is #179 of 296 councils on householder decision speed. 49% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Staffordshire decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #211 of 296
91%
Householder approved
Above avg (90%) #180 of 296
61%
Decided in 8 weeks
Below avg (63%) #179 of 296
49%
Extended time limit
Above avg (41%) #222 of 296
71%
Minor dwellings approved
75 decided (1-9 homes)
88%
Major dwellings approved
8 decided (10+ homes)
87%
Change of use approved
23 decided
612
Total decisions
89 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.