Land To The East Of High Green Brooke Norfolk Data via plota.co.uk

2026/2838 - Full Pending Consideration

Proposal

Construction of two self-build dwellings with access, parking, and gardens. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Sept 2026
✓
Validated
6 Oct 2026
✓
Consultation
7 Oct 2026
Decision
Expected by 1 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 29 Dec 2026 and 17 Jan 2027, from South Norfolk Broadland's recent new homes.

Comments are open until 28 Oct 2026

Comment on this application ↗

Site constraints 4

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 123 m away: East Pye Solar
The site is 123 m from the project boundary. Generating station, under examination.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Priority habitat 39 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 7 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Norfolk Broadland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Postcode
NR15 1JE
Received
22 Sept 2026
Validated
6 Oct 2026
Ward
Brooke
Parish
Brooke
Target decision
1 Dec 2026
Applicant
Show
Agent
Small Fish

Decision outlook

Day 3 of the 56-day target. South Norfolk Broadland usually decides new homes by day 91.

Day 388 days to the predicted decision (day 91)
24%decided within 8 weeks
65%approved
84decided in the last year

Plota live figures for new homes decided by South Norfolk Broadland in the last twelve months, from validation. South Norfolk Broadland decision record →

Public comments

No public comments yet.

4 neighbours consulted · Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15224938
Planning Portal ref
PP-15224938
Neighbours
7 Oct 2026
Consultation
7 Oct 2026
Comments by
28 Oct 2026
Statutory expiry
1 Dec 2026
Env. assessment
No
South Norfolk Broadland
Planning Authority Score
5.9/10
Average
#106 of 296 councils
Relevant to this application:
Householder decisions

South Norfolk Broadland ranks #136 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Norfolk Broadland decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #50 of 296
95%
Householder approved
Above avg (90%) #71 of 296
67%
Decided in 8 weeks
Above avg (63%) #136 of 296
42%
Extended time limit
Above avg (41%) #161 of 296
82%
Minor dwellings approved
137 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
100%
Change of use approved
33 decided
1,013
Total decisions
67 refused in the year to March 2026