Land at Uphampton Farm Docklow Leominster Herefordshire HR6 0SN Data via plota.co.uk

P260379/RM - Approval of Reserved Matters Approved

Proposal

Application for variation of a condition 1 following grant of planning permission (Application for approval of reserved matters following outline approval (Proposed residential development of 6 dwellings, improvements to existing agricultural access, provision of orchard strip, foul drainage treatment plant and other associated works)) - changes to approved plans Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Feb 2026
✓
Validated
27 Feb 2026
✓
Approved
12 May 2026

Approved on 12 May 2026 · Last checked 23 Sept 2026

Associated applications 3

  • Part of

    Reserved matterscouncil archive
    • Reserved mattersApplication for variation of a condition 1 following grant of planning permission 204051…This applicationP260379/RM
  • Outlinecouncil archive

Site constraints 4

Nutrient neutrality catchment: River Wye SAC (River Lugg SSSI)
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 3.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Herefordshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Approval of Reserved Matters
Postcode
HR6 0SN
Received
6 Feb 2026
Validated
27 Feb 2026
Ward
Hampton
Parish
Docklow and Hampton Wafre
Target decision
24 Apr 2026
Decision
Approved with Conditions
Decision date
12 May 2026

Consultation & key dates

Consultation
3 Mar 2026
Comments by
24 Mar 2026
Site or press notice
3 Mar 2026
Herefordshire
Planning Authority Score
3.3/10
Poor
#224 of 296 councils
Relevant to this application:
Major dwellings

Herefordshire is slower than most councils at deciding householder applications, ranking #250 out of 296. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Herefordshire decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #56 of 296
95%
Householder approved
Above avg (90%) #79 of 296
46%
Decided in 8 weeks
Below avg (63%) #250 of 296
60%
Extended time limit
Above avg (41%) #269 of 296
89%
Minor dwellings approved
278 decided (1-9 homes)
67%
Major dwellings approved
18 decided (10+ homes)
92%
Change of use approved
104 decided
1,406
Total decisions
96 refused in the year to March 2026