Millbank House 1 - 7 Little College Street London SW1P 3SH Data via plota.co.uk

25/00720/LBC - Listed Building Consent Application Approved

Proposal

Installation of electrical equipment Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Feb 2025
✓
Approved
26 Mar 2025

Approved on 26 Mar 2025 · Delegated Decision · Last checked 11 Nov 2026

Site constraints 13

Grade II* listed: 1 and 2 Millbank, The Church Commissioners (including No 3 Great College Street, No 2 Great Peter Street and Nos 5 and 7 Little College Street)
List entry 1267603 · The pin is inside its outline · 68 more listed buildings within 150 m (10 Grade I, 26 Grade II*, 32 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 68 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Smith Square conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Article 4 direction
Article 4 Basement Development Permitted Rights Removed. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: City of Westminster APA 1.1
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Westminster AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 34 m away: Thames Tideway Tunnel
The site is 34 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 166 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
World heritage site 36 m away: Palace of Westminster, Westminster Abbey and St. Margaret's Church
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Scheduled monument 108 m away: The Jewel Tower
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Also on the record
Inside the City of Westminster built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square.
Not affected
Not green belt

Checked on 11 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Westminster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent Application
Postcode
SW1P 3JU
Received
3 Feb 2025
Validated
3 Feb 2025
Ward
St James's
Case officer
Show
Target decision
31 Mar 2025
Decision
Application Permitted
Decision date
26 Mar 2025
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 51 days from validation, 6 days faster than Westminster's median of 57 for listed building works. Approved, as 90% of listed building works here are.

49%decided within 8 weeks
90%approved
2,227decided in the last year

Plota live figures for listed building works decided by Westminster in the last twelve months, from validation. Westminster decision record →

Public comments

No public comments yet.

Last counted 11 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-13747205
Planning Portal ref
PP-13747205
Comments by
19 Mar 2025
Site or press notice
26 Feb 2025
Env. assessment
No
Westminster
Planning Authority Score
3.5/10
Below average
#221 of 296 overall
Relevant to this application:
Other decisions

Westminster is slower than most councils at deciding householder applications: #258 of 296 on speed. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Westminster decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #201 of 296
81%
Householder approved
Below avg (90%) #277 of 296
44%
Decided in 8 weeks
Below avg (63%) #258 of 296
28%
Extended time limit
Below avg (41%) #46 of 296
83%
Minor dwellings approved
12 decided (1-9 homes)
67%
Major dwellings approved
3 decided (10+ homes)
81%
Change of use approved
133 decided
4,602
Total decisions
648 refused in the year to March 2026