78 High Street, Meppershall, Shefford, SG17 5LZ Data via plota.co.uk

CB/26/02470/FULL - Full Application Approved

Proposal

Demolition of existing garage and alterations to existing bungalow and erection of two chalet style dwellings with detached car barns Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Aug 2026
✓
Validated
11 Aug 2026
✓
Approved
23 Oct 2026

Approved on 23 Oct 2026 · Last checked 24 Oct 2026

Site constraints 3

Also on the record
1 listed building within 150 m; Inside the Meppershall built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £630,000 in October 2025. Detached house, freehold.

2 October 2025£630,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area139 m² (1,496 sq ft)
Energy ratingD (68 out of 100), could reach B
PropertyDetached bungalow, 7 habitable rooms
Built1950 to 1966
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in April 2025, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Central Bedfordshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
SG17 5LZ
Received
10 Aug 2026
Validated
11 Aug 2026
Parish
Meppershall
Case officer
Show
Target decision
6 Oct 2026
Decision
Full Application - Granted Conditions or Reasons: View Conditions or Reasons Informative Notes: 1 )GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF). 2 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority. 3 )The applicant is advised where roofing work or timber treatment is to be undertaken it is the legal responsibility of the contractor to check for bats. If bats are found�during the course of�any work to buildings or trees where not previously anticipated, then works should immediately stop and Natural England notified for appropriate advice.�The applicant is advised where roofing work or timber treatment is to be undertaken it is the legal responsibility of the contractor to check for bats. If bats are found�during the course of�any work to buildings or trees where not previously anticipated, then works should immediately stop and Natural England notified for appropriate advice.� 4 )The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system. � The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by contacting The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301 or e-mail: streetworks@centralbedfordshire.gov.uk � The applicant is advised that parking for contractor's vehicles and the storage of materials and deliveries associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby approved � The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway � The applicant is advised that all cycle parking to be provided within the site shall be designed in accordance with the Central Bedfordshire Council's : Parking standards for new developments Supplementary Planning Document (SPD) | Central Bedfordshire Council � The applicant is advised that no works associated with the CTMP should be carried out within the confines of the public highway without prior consent, in writing, of the Central Bedfordshire Council. Upon receipt of this Notice of Planning Approval, the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301 quoting the Planning Application number. This will enable the necessary consent and procedures under the Highways Act to be implemented.The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system. � The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by contacting The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301 or e-mail: streetworks@centralbedfordshire.gov.uk � The applicant is advised that parking for contractor's vehicles and the storage of materials and deliveries associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby approved � The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway � The applicant is advised that all cycle parking to be provided within the site shall be designed in accordance with the Central Bedfordshire Council's : Parking standards for new developments Supplementary Planning Document (SPD) | Central Bedfordshire Council � The applicant is advised that no works associated with the CTMP should be carried out within the confines of the public highway without prior consent, in writing, of the Central Bedfordshire Council. Upon receipt of this Notice of Planning Approval, the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301 quoting the Planning Application number. This will enable the necessary consent and procedures under the Highways Act to be implemented. 5 )You are advised to note the comments of the CBC Flood Risk Officer as set out below: 1. Surface water drainage must follow the SuDS National Standards; National standards for sustainable drainage systems (SuDS) - GOV.UK 2. The Council is not required to adopt any SuDS feature, this subject to agreements. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). 3. The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753)You are advised to note the comments of the CBC Flood Risk Officer as set out below: 1. Surface water drainage must follow the SuDS National Standards; National standards for sustainable drainage systems (SuDS) - GOV.UK 2. The Council is not required to adopt any SuDS feature, this subject to agreements. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). 3. The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753) 6 )It should be noted that the existing tree belt at the rear of site is shown to be retained (approved drawing ref: HSMEPP02/ rev B)It should be noted that the existing tree belt at the rear of site is shown to be retained (approved drawing ref: HSMEPP02/ rev B)
Decision date
23 Oct 2026

How this decision compares

Decided in 73 days from validation, 18 days slower than Central Bedfordshire's median of 55 for demolitions. Approved, as 83% of demolitions here are.

68%decided within 8 weeks
83%approved
201decided in the last year

Plota live figures for demolitions decided by Central Bedfordshire in the last twelve months, from validation. Central Bedfordshire decision record →

Public comments

6comments received
6 objecting

100% object · above the UK average of 74%

Last counted 24 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
11 Aug 2026
Comments by
13 Oct 2026
Site or press notice
26 Aug 2026
Central Bedfordshire
Planning Authority Score
6.3/10
Average
#88 of 296 overall
Relevant to this application:
Householder decisions

Central Bedfordshire is faster than most councils at deciding householder applications: #62 of 296 on speed. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Central Bedfordshire decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #218 of 296
91%
Householder approved
Above avg (90%) #169 of 296
76%
Decided in 8 weeks
Above avg (63%) #62 of 296
35%
Extended time limit
Below avg (41%) #99 of 296
61%
Minor dwellings approved
153 decided (1-9 homes)
86%
Major dwellings approved
29 decided (10+ homes)
73%
Change of use approved
45 decided
1,444
Total decisions
226 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.