Village Underground Limited, Railway Carriages Above, 54 Holywell Lane, Hackney, London, EC2A 3PQ Data via plota.co.uk

2025/1982 - Full Planning Permission Approved

Proposal

Removal of two underground tube carriages, installation of a pergola, glass balustrade, replacement access staircase and new access staircase, all in connection with use of existing rooftop shipping containers for the provision of daytime work spaces, evening food and drink (servery), and use of the rooftop terrace as amenity space including the installation of a pergola and replacement access staircase, all ancillary to the primary arts and cultural venue Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Sept 2025
✓
Validated
27 Oct 2025
✓
Approved
13 Feb 2026

Approved on 13 Feb 2026 · Delegated · Last checked 18 Oct 2026

Documents 35

Plans & drawings 23

PDF Proposed-Great-Eastern-Street-Elevation-Detail Drawing · 27 Oct 2025 View ↗ PDF Proposed-Great-Eastern-Street-Elevation-Detail-II Drawing · 27 Oct 2025 View ↗ PDF Proposed-Level-2-Layout Drawing · 7 Oct 2025 View ↗ PDF Proposed-Level-1-Layout Drawing · 7 Oct 2025 View ↗ PDF Proposed-Holywell-Lane-Section Drawing · 7 Oct 2025 View ↗ PDF Proposed-Holywell-Lane-Elevation Drawing · 7 Oct 2025 View ↗ PDF Proposed-Great-Eastern-Street-Section Drawing · 7 Oct 2025 View ↗ PDF Proposed-Great-Eastern-Street-Elevation Drawing · 7 Oct 2025 View ↗ PDF Existing-Level-2-Layout Drawing · 7 Oct 2025 View ↗ PDF Existing-Level-1-Layout Drawing · 7 Oct 2025 View ↗ PDF Existing-Holywell-Lane-Section Drawing · 7 Oct 2025 View ↗ PDF Existing-Holywell-Lane-Elevation Drawing · 7 Oct 2025 View ↗ PDF Existing-Great-Eastern-Street-Section Drawing · 7 Oct 2025 View ↗ PDF Existing-Great-Eastern-Street-Elevation Drawing · 7 Oct 2025 View ↗ PDF Proposed Level 2 Layout.pdf Drawing · 9 Sept 2025 View ↗ PDF Proposed Level 1 Layout.pdf Drawing · 9 Sept 2025 View ↗ PDF Layout Plan - Existing Drawing · 9 Sept 2025 View ↗ PDF Site Location Plan.pdf Site Location Plan · 9 Sept 2025 View ↗ PDF Elevation (Front) - Proposed Drawing · 9 Sept 2025 View ↗ PDF Elevation (Rear) - Proposed Drawing · 9 Sept 2025 View ↗ PDF Floor Plan - Existing Drawing · 9 Sept 2025 View ↗ PDF Elevation (Front) - Existing Drawing · 9 Sept 2025 View ↗ PDF Elevation (Rear) - Existing Drawing · 9 Sept 2025 View ↗

All documents on the council site ↗

Site constraints 14

South Shoreditch conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
3 Article 4 directions
Whole of the London Borough of Hackney · Exemption Area (part 1) · Hackney Central Activity Zone. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: Hackney APA 2.11 Shoreditch
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Hackney AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Shoreditch
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Scheduled monument 125 m away: The Theatre Playhouse
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
14 listed buildings within 150 m
Nearest: 6-8, Great Eastern Street, Grade II, 60 m away · 14 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 14 with distances
Historic England ↗
Also on the record
Wider setting of protected view 8A.1 Westminster Pier to St Paul's Cathedral; National infrastructure project 1533 m away: Thames Tideway Tunnel; Inside the Hackney built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Heritage at risk 89 m away: 187, Shoreditch High Street.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hackney - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hackney
Application type
Full Planning Permission
Postcode
EC2A 3PQ
Received
8 Sept 2025
Validated
27 Oct 2025
Ward
Hoxton East and Shoreditch Ward
Case officer
Show
Target decision
13 Feb 2026
Decision
Grant
Decision date
13 Feb 2026
Decision level
Delegated
Applicant
Show
Agent
Bidwells LLP

How this decision compares

Decided in 109 days from validation, 22 days slower than Hackney's median of 87 for commercial and major works. Approved, as 78% of commercial and major works here are.

18%decided within 8 weeks
78%approved
8%go to committee

Plota live figures for commercial and major works decided by Hackney in the last twelve months, from validation. Hackney decision record →

Consultation & key dates

Statutory expiry
13 Feb 2026
Hackney
Planning Authority Score
2.4/10
Poor
#256 of 296 councils
Relevant to this application:
Householder decisions

Hackney is slower than most councils at deciding householder applications, ranking #220 out of 296. Hackney is also one of the strictest councils - it refuses more householder applications than almost any other, with only 84% approved vs 90% nationally.

One of the strictest councils
only 84% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Hackney decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #248 of 296
84%
Householder approved
Below avg (90%) #257 of 296
53%
Decided in 8 weeks
Below avg (63%) #220 of 296
46%
Extended time limit
Above avg (41%) #201 of 296
75%
Minor dwellings approved
204 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
50%
Change of use approved
2 decided
1,323
Total decisions
241 refused in the year to March 2026