263616PNT - Prior Notification Telecoms Pending Consideration

Proposal

Installation of a 20-metre-high street works monopole which will support 9no. radio antennas, 2no. transmission dishes, 4no equipment cabinets and ancillary equipment (56 Day Prior Notification Process) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Sept 2026
✓
Consultation
5 Oct 2026
Decision
Expected by 25 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 9 Nov 2026, from Ealing's recent prior approvals.

Comments are open until 30 Oct 2026

Comment on this application ↗

Documents 15

All documents on the council site ↗

Site constraints 7

Locally significant industrial site
A borough-level industrial site.
Boroughs protect these sites for industrial and related uses.
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 825 m away: Thames Tideway Tunnel
The site is 825 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Local nature reserve 412 m away: Gunnersbury Triangle; Inside the Ealing built-up area; Public transport access: PTAL 4 (good), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area427 m² (4,596 sq ft)
Energy ratingC (asset rating 61)
UseGeneral Industrial and Special Industrial Groups
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in September 2022, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Prior Notification Telecoms
Postcode
W3 8BL
Received
30 Sept 2026
Validated
30 Sept 2026
Ward
South Acton
Case officer
Show
Target decision
25 Nov 2026
Applicant
Show
Agent
Dot Surveying Limited

Decision outlook

Day 9 of the 56-day target. Ealing usually decides prior approvals by day 40.

Day 947 days to the 56-day target
91%decided within 8 weeks
76%approved
234decided in the last year

Plota live figures for prior approvals decided by Ealing in the last twelve months, from validation. Ealing decision record →

Public comments

No public comments yet.

Last counted 5 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15257356
Planning Portal ref
PP-15257356
Consultation
5 Oct 2026
Comments by
30 Oct 2026
Statutory expiry
25 Nov 2026
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 councils
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications, ranking #264 out of 296. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.