Airedale Energy Limited Solar Farm Snaith Road East Cowick East Riding Of Yorkshire Data via plota.co.uk

26/02021/PLF - Full Planning Permission Approved

Proposal

Installation of biomass boiler Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
31 Jul 2026
✓
Approved
11 Sept 2026

Approved on 11 Sept 2026 · Delegated Decision · Last checked 18 Sept 2026

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Flood storage area
Land engineered to hold flood water and protect somewhere else.
The Environment Agency will object to anything that reduces the storage.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 186 m away: Yorkshire and Humber CCS Cross Country Pipeline
The site is 186 m from the project boundary. Pipeline, decided. The project page says whether consent was granted. Also within 2 km: Humber Carbon Capture Pipeline (at pre-application, 40 m); East Coast Hydrogen Humber Pipeline (at pre-application, 1502 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Coalfield, development low risk area.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Riding - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Received
31 Jul 2026
Validated
31 Jul 2026
Ward
Snaith, Airmyn & Rawcliffe & Marshland
Parish
Snaith And Cowick Town Council
Case officer
Show
Target decision
25 Sept 2026
Decision
Approve
Decision date
11 Sept 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Hayward Architects

How this decision compares

Decided in 42 days from validation, 13 days faster than East Riding's median of 55 for full applications. Approved, as 89% of full applications here are.

92%decided within 8 weeks
89%approved
1,138decided in the last year

Plota live figures for full applications decided by East Riding in the last twelve months, from validation. East Riding decision record →

Public comments

No public comments yet.

Last counted 11 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
5 Sept 2026
Env. assessment
No
East Riding
Planning Authority Score
8.1/10
Excellent
#24 of 296 councils
Relevant to this application:
Householder decisions

East Riding is one of the fastest councils in England for householder decisions, ranking #7 out of 296. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Riding decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #110 of 296
92%
Householder approved
Above avg (90%) #152 of 296
95%
Decided in 8 weeks
Above avg (63%) #7 of 296
14%
Extended time limit
Below avg (41%) #9 of 296
76%
Minor dwellings approved
190 decided (1-9 homes)
95%
Major dwellings approved
42 decided (10+ homes)
86%
Change of use approved
79 decided
1,887
Total decisions
198 refused in the year to March 2026