Land East of, School Road, Copford Colchester CO6 1BX Data via plota.co.uk

261331 - Outline (13 Week Determination) Application Valid

Proposal

Outline application with some maters reserved for Phased erection of either up to 340 dwellings (Class C3) or the erection of up-to 300 dwellings (Class C3) and military veterans accommodation (Class C2) (comprising up-to 50 flats and supporting facili Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Jul 2026
Decision
Expected by 16 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 84.

The consultation period closed on 21 Aug 2026.

Site constraints 5

National infrastructure project about 715 m away: A12 Chelmsford to A120 Widening Scheme
The site is about 715 m from the project boundary. Highway, decided. The project page says whether consent was granted. Also within 2 km: Norwich to Tilbury (examination closed, recommendation due, about 1978 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
1 listed building within 150 m of the postcode pin; Inside the Copford built-up area; Priority habitat about 50 m away: Traditional orchard; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Colchester - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Colchester
Application type
Outline (13 Week Determination)
Postcode
CO6 1BX
Received
17 Jul 2026
Validated
17 Jul 2026
Ward
Marks Tey & Layer
Parish
Copford with Easthorpe
Case officer
Show
Target decision
16 Oct 2026

Decision outlook

Day 84, past Colchester's usual 56 days for changes of use. 81% are decided within thirteen weeks, so most likely by 16 Oct 2026.

Day 847 days to the 91-day target
55%decided within 8 weeks
72%approved
79decided in the last year

Plota live figures for changes of use decided by Colchester in the last twelve months, from validation. Colchester decision record →

Consultation & key dates

Comments by
21 Aug 2026
Colchester
Planning Authority Score
6.2/10
Average
#91 of 296 councils
Relevant to this application:
Major dwellings

Colchester is faster than most councils at deciding householder applications, ranking #43 out of 296. Only 27% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Colchester is also one of the strictest councils - it refuses more householder applications than almost any other, with only 84% approved vs 90% nationally.

One of the strictest councils
only 84% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Colchester decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #245 of 296
84%
Householder approved
Below avg (90%) #255 of 296
79%
Decided in 8 weeks
Above avg (63%) #43 of 296
27%
Extended time limit
Below avg (41%) #39 of 296
67%
Minor dwellings approved
69 decided (1-9 homes)
85%
Major dwellings approved
13 decided (10+ homes)
75%
Change of use approved
89 decided
1,074
Total decisions
188 refused in the year to March 2026