Land East Of George Lane Kilmington Data via plota.co.uk

26/1797/MOUT - Major - Outline application Awaiting decision

Proposal

Outline application, with access to be determined and all other matters reserved, for up to 41 dwellings with associated access, public open space, landscaping, drainage and infrastructure, including the provision of acoustic mitigation. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 3 Sept 2026
Decision
Expected by 3 Dec 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision between 31 Oct 2026 and 18 Nov 2026, from East Devon's recent new homes.

Documents 22

Statements & assessments 18

PDF 2527-JRC-EXT-RP-CE-0001-P3 FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY Statements and Surveys · 3 Sept 2026 View ↗ PDF 0500 P3 DRAINAGE STRATEGY Statements and Surveys · 3 Sept 2026 View ↗ PDF ECOLOGICAL SURVEY Statements and Surveys · 3 Sept 2026 View ↗ PDF HABITATS REGULATIONS ASSESSMENT Biodiversity Net Gain · 3 Sept 2026 View ↗ PDF 1.0 ECOLOGICAL IMPACT ASSESSMENT Statements and Surveys · 3 Sept 2026 View ↗ PDF BIODIVERSITY METRIC CALCULATION TOOL Biodiversity Net Gain · 3 Sept 2026 View ↗ PDF BNG STATEMENT Biodiversity Net Gain · 3 Sept 2026 View ↗ PDF ARCHAEOLOGICAL MAGNETOMETER SURVEY Statements and Surveys · 3 Sept 2026 View ↗ PDF ACA0236/1/0 HISTORIC ENVIRONMENT STATEMENT Statements and Surveys · 3 Sept 2026 View ↗ PDF 8314 REV 1 ENVIRONMENTAL NOISE ASSESSMENT Statements and Surveys · 3 Sept 2026 View ↗ PDF RMA-RC944 NUTRIENT NEUTRALITY ASSESSMENT AND MITIGATION STRATEGY Statements and Surveys · 3 Sept 2026 View ↗ PDF STATEMENT OF COMMUNITY INVOLVEMENT Statements and Surveys · 3 Sept 2026 View ↗ PDF 237447 V1 TRAVEL PLAN STATEMENT Statements and Surveys · 3 Sept 2026 View ↗ PDF 237447 V3 TRANSPORT ASSESSMENT Statements and Surveys · 3 Sept 2026 View ↗ PDF ARBORICULTURAL SURVEY AND REPORT Statements and Surveys · 3 Sept 2026 View ↗ PDF PLANNING STATEMENT Statements and Surveys · 3 Sept 2026 View ↗ PDF 241009 R 02 C LANDSCAPE AND VISUAL IMPACT ASSESSMENT Statements and Surveys · 3 Sept 2026 View ↗ PDF 241009 R 01 C DESIGN AND ACCESS STATEMENT Statements and Surveys · 3 Sept 2026 View ↗

All documents on the council site ↗

Site constraints 4

Nutrient neutrality catchment: River Axe SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
East Devon National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 30 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Devon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
East Devon
Application type
Major - Outline application
Received
around 3 Sept 2026
Validated
3 Sept 2026
Ward
Newbridges
Parish
Kilmington
Applicant
Show
Agent
Lucy White Planning Limited

Decision outlook

Day 31 of the 91-day target. East Devon usually decides new homes by day 64.

Day 3160 days to the 91-day target
37%decided within 8 weeks
67%approved
18%go to committee

Plota live figures for new homes decided by East Devon in the last twelve months, from validation. East Devon decision record →

Public comments

1comment received
1 objecting

33 neighbours consulted · Last counted 30 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15135050
Site or press notice
23 Sept 2026
Env. assessment
No
East Devon
Planning Authority Score
6.7/10
Good
#72 of 296 councils
Relevant to this application:
Major dwellings

East Devon ranks #103 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Devon decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #152 of 296
94%
Householder approved
Above avg (90%) #104 of 296
72%
Decided in 8 weeks
Above avg (63%) #103 of 296
34%
Extended time limit
Below avg (41%) #86 of 296
63%
Minor dwellings approved
168 decided (1-9 homes)
74%
Major dwellings approved
23 decided (10+ homes)
88%
Change of use approved
25 decided
1,321
Total decisions
157 refused in the year to March 2026