26/04163/HFUL - Householder Works/Extension Awaiting decision

Proposal

External insulated render and composite cladding boards to existing brickwork external walls. Enlarged dropped kerb to front driveway. New and replacement windows, Lantern rooflight and existing porch enclosed. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Nov 2026
✓
Validated
10 Nov 2026
Decision
Expected by 5 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 3 Jan 2027, from Cambridge's recent extensions.

Site constraints 2

Also on the record
National infrastructure project 1.3 km away: A14 Cambridge to Huntingdon Improvement Scheme; Inside the Cambridge (Cambridge) built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 12 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area105 m² (1,130 sq ft)
Energy ratingD (60 out of 100), could reach B
PropertyDetached house, 5 habitable rooms
Built1900 to 1929
HeatingBoiler and radiators, mains gas
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in May 2024, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Cambridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cambridge
Application type
Householder Works/Extension
Postcode
CB3 0HR
Received
5 Nov 2026
Validated
10 Nov 2026
Ward
Castle
Case officer
Show
Target decision
5 Jan 2027
Applicant
Show
Agent
Twitchett Architect

Decision outlook

Day 13 of the 56-day target. Cambridge usually decides extensions by day 54.

Day 1343 days to the 56-day target
81%decided within 8 weeks
97%approved
555decided in the last year

Plota live figures for extensions decided by Cambridge in the last twelve months, from validation. Cambridge decision record →

Public comments

No public comments yet.

7 neighbours consulted · Last counted 18 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
5 Jan 2027
Env. assessment
No
Cambridge
Planning Authority Score
8.3/10
Excellent
#18 of 296 overall
Relevant to this application:
Householder decisions

Cambridge is one of the fastest councils in England for householder decisions: #21 of 296 on speed. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cambridge decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #108 of 296
94%
Householder approved
Above avg (90%) #100 of 296
86%
Decided in 8 weeks
Above avg (63%) #21 of 296
26%
Extended time limit
Below avg (41%) #34 of 296
74%
Minor dwellings approved
86 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
80%
Change of use approved
41 decided
1,014
Total decisions
100 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.