A4130, Milton Heights, Didcot, OX14 4RX Data via plota.co.uk

P26/V0450/CM - County Matters Approved

Proposal

Section 73 application to continue the development permitted by R3. (The dualling of the A4130 carriageway (A4130 Widening) from the Milton Gate Junction eastwards, including the construction of three roundabouts. A road bridge over the Great Western Mainline (Didcot Science Bridge) and realignment of the A4130 north east of the proposed road bridge including the relocation of a lagoon. Construction of a new road between Didcot and Culham (Didcot to Culham River Crossing) including the construction of three roundabouts, a road bridge over the Appleford railway sidings and road bridge over the River Thames. Construction of a new road between the B4015 and A415 (Clifton Hampden bypass), including the provision of one roundabout and associated junctions. And controlled crossings, footways and cycleways, landscaping, lighting, noise barriers and sustainable drainage systems) without complying with condition 20 to vary the timing for a level compensatory flood storage to be submitted and approved by the County Planning Authority Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Feb 2026
✓
Approved
18 Mar 2026

Approved on 18 Mar 2026 · Delegated · Last checked 25 Sept 2026

Site constraints 1

Agricultural land, grade 4, surveyed
Poor quality farmland, not best and most versatile. Source: Natural England's post-1988 ALC field survey (Reading). Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2; the survey is the definitive reading.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Survey report ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Vale of White Horse - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Nearby new applications

18 Sept 2026Pending

Sutton Courtenay Waste Management Centre, Appleford Sidings, Abingdon, OX14 4PW

Section 73 application to continue the development permitted by MW.0039/15 P15/V...

P26/V4217/CM
18 Sept 2026Pending

Corridor between the A34 Milton Interchange and, the B4015 north of Clifton Hampden including part of the A4130 east of the, A34 Milton Interchange, land between Didcot and the former Didcot A Power, Station and the Great Western Mainline, land to the north of Didcot where it, crosses a private railway sidings and the River Thames to the west of, Appleford-on-Thames before joining the A415 west of Culham Station, land to, the south of Culham Science Centre through to a connection with the B4015, north of Clifton Hampden

Details pursuant to Condition 29 (Written Scheme of Archaeological Investigation...

P26/S4219/CM
18 Sept 2026Pending

Corridor between the A34 Milton Interchange and, the B4015 north of Clifton Hampden including part of the A4130 east of the, A34 Milton Interchange, land between Didcot and the former Didcot A Power, Station and the Great Western Mainline, land to the north of Didcot where it, crosses a private railway sidings and the River Thames to the west of, Appleford-on-Thames before joining the A415 west of Culham Station, land to, the south of Culham Science Centre through to a connection with the B4015, north of Clifton Hampden

Details pursuant to Condition 29 (Written Scheme of Archaeological Investigation...

P26/V4220/CM
27 Aug 2026Decided

Corridor between the A34 Milton Interchange and the B4015 north of Clifton Hampden including part of the A4130 east of the A34 Milton Interchange, land between Didcot and the former Didcot A Power Station and the Great Western Mainline, land to the north of Didcot where it crosses a private railway sidings and the River Thames to the west of Appleford-on-Thames before joining the A415 west of Culham Station, land to the south of Culham Science Centre through to a connection with the B4015 north of Clifton Hampden

Non-material amendment to permission no. R3.0025/26 to vary the wording of condi...

P26/V3928/CM
22 Jul 2026Decided

Sutton Courtenay Rail Sidings, Appleford Sidings, Sutton Courtenay, OX14 4PJ

Erection of boundary fencing.

P26/V3385/CM

Important details

Application type
County Matters
Postcode
OX14 4RX
Received
19 Feb 2026
Validated
19 Feb 2026
Case officer
Show
Target decision
12 Mar 2026
Decision
County Matter - Approval Recommendation
Decision date
18 Mar 2026
Decision level
Delegated
Applicant
Show
Agent
AECOM

Public comments

No public comments yet.

Last counted 25 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
12 Mar 2026
Vale of White Horse
Planning Authority Score
4.5/10
Below average
#176 of 296 councils
Relevant to this application:
Householder decisions

Vale of White Horse ranks #198 out of 296 councils for householder decision speed. 51% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Vale of White Horse decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #32 of 296
96%
Householder approved
Above avg (90%) #64 of 296
57%
Decided in 8 weeks
Below avg (63%) #198 of 296
51%
Extended time limit
Above avg (41%) #232 of 296
86%
Minor dwellings approved
83 decided (1-9 homes)
88%
Major dwellings approved
16 decided (10+ homes)
90%
Change of use approved
31 decided
1,015
Total decisions
51 refused in the year to March 2026