Unit 3-5 Central Park Central Way London NW10 7FY Data via plota.co.uk

253113CONS - Consultation by Other Boroughs No Objection

Proposal

Variation of condition 8 (Details of hard and soft landscaping) to allow: Replacement of original living wall with artificial green wall of Full Planning Permission application reference dated 31/07/2015 for Proposed erection of a two storey plant building with antenna platform to frontage of Unit 4 and associated landscaping and alterations to car parking. Change of use of Unit 3 from B1(a), B2 and B8 use to a television studio (Use Class B1(b)). Alterations to fenestration and external finishes of Units 4 and 5 (amended address) (Out of Borough) Data via plota.co.uk

View original council record ↗Last checked

Ealing Council is publishing its applications late: so far it has put about three fifths of those it has numbered since early September on its register. Plota adds each one as soon as the council publishes it.

Application progress

✓
Received
11 Aug 2025
Decision
Target date was 1 Sept 2025

Under consideration

No decision has been issued yet. The council's target date, 1 Sept 2025, has passed.

Site constraints 5

Strategic industrial land
Reserved for industry and logistics.
The London Plan protects strategic industrial locations from other uses; release needs a plan-led process.
Air quality management area: Brent AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Brent built-up area; Public transport access: PTAL 1a (very poor), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Consultation by Other Boroughs
Postcode
NW10 7FY
Received
11 Aug 2025
Validated
11 Aug 2025
Ward
Out Of Borough
Case officer
Show
Target decision
1 Sept 2025
Decision level
Delegated Decision

Public comments

No public comments yet.

Last counted 19 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
1 Sept 2025
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 overall
Relevant to this application:
Change of use

Ealing is slower than most councils at deciding householder applications: #264 of 296 on speed. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026