The Green Warehouse Severn Road Avonmouth Bristol BS11 0YL Data via plota.co.uk

25/14659/F - Full Planning Approved

Proposal

Change of Use from vehicle recycling centre (Sui Generis) to B8 Storage and distribution, along with minor physical amendments to the existing building at Former PR Recycling site, Severn Road, Bristol, BS11 0YL. (Major) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Oct 2025
✓
Validated
27 Nov 2025
✓
Approved
11 Mar 2026

Approved on 11 Mar 2026 · Delegated Decision · Last checked 22 Nov 2026

Documents 22

All documents on the council site ↗

Site constraints 3

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project about 197 m away: Hinkley Point C Connection
The site is about 197 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: Hinkley Point C Connection Project Material Change (at pre-application, about 87 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Hallen built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 8 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bristol - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bristol
Application type
Full Planning
Postcode
BS11 0YL
Received
23 Oct 2025
Validated
27 Nov 2025
Ward
Avonmouth & Lawrence Weston
Parish
Avonmouth And Lawrence Weston
Target decision
11 Mar 2026
Decision
GRANTED subject to condition(s)
Decision date
11 Mar 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Steve Spaven

How this decision compares

Decided in 104 days from validation, 44 days slower than Bristol's median of 60 for full applications. Approved, as 77% of full applications here are.

45%decided within 8 weeks
77%approved
518decided in the last year

Plota live figures for full applications decided by Bristol in the last twelve months, from validation. Bristol decision record →

Public comments

No public comments yet.

Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14391209
Planning Portal ref
PP-14391209
Comments by
28 Jan 2026
Statutory expiry
26 Feb 2026
Bristol
Planning Authority Score
5.8/10
Average
#109 of 296 overall
Relevant to this application:
Change of use

Bristol is #112 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Bristol decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #190 of 296
92%
Householder approved
Above avg (90%) #149 of 296
71%
Decided in 8 weeks
Above avg (63%) #112 of 296
37%
Extended time limit
Below avg (41%) #118 of 296
74%
Minor dwellings approved
374 decided (1-9 homes)
93%
Major dwellings approved
30 decided (10+ homes)
82%
Change of use approved
150 decided
2,098
Total decisions
293 refused in the year to March 2026