ATM Site At Tesco Maritime House Discovery Quay Falmouth Cornwall TR11 3XA Data via plota.co.uk

PA26/07483 - Full application Awaiting decision

Proposal

Replacement of an existing glazed panel with a ventilation louvre. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 17 Nov 2026
Decision
Expected by 12 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 10 Jan 2027, from Cornwall's recent extensions.

Site constraints 7

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Penzance to St. Mawes across the site
Matters where it crosses or adjoins the site; the route and its margin are protected.
Special area of conservation 42 m away: Fal & Helford
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
7 listed buildings within 150 m; Conservation area 65 m away: Falmouth; Inside the Falmouth built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 19 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cornwall - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cornwall
Application type
Full application
Postcode
TR11 3XA
Received
around 17 Nov 2026
Validated
17 Nov 2026
Ward
Falmouth Arwenack
Parish
Falmouth
Case officer
Show
Target decision
12 Jan 2027
Applicant
Show
Agent
Inspire Design Ltd

Decision outlook

Day 6 of the 56-day target. Cornwall usually decides extensions by day 54.

Day 650 days to the 56-day target
82%decided within 8 weeks
95%approved
100%go to committee

Plota live figures for extensions decided by Cornwall in the last twelve months, from validation. Cornwall decision record →

Public comments

No public comments yet.

Last counted 19 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14183648
Planning Portal ref
PP-14183648
Statutory expiry
12 Jan 2027
Env. assessment
No
Cornwall
Planning Authority Score
7.9/10
Good
#28 of 296 overall
Relevant to this application:
Householder decisions

Cornwall is faster than most councils at deciding householder applications: #64 of 296 on speed. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Cornwall decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #79 of 296
97%
Householder approved
Above avg (90%) #28 of 296
76%
Decided in 8 weeks
Above avg (63%) #64 of 296
35%
Extended time limit
Below avg (41%) #101 of 296
82%
Minor dwellings approved
1180 decided (1-9 homes)
94%
Major dwellings approved
67 decided (10+ homes)
93%
Change of use approved
194 decided
4,839
Total decisions
363 refused in the year to March 2026