Kilnocyn Gwespyr, Holywell, CH8 9JS Data via plota.co.uk

OUT/000461/26 - Outline Publication period closed

Proposal

Use of part garden of Kilnocyn for the construction of affordable housing to satisfy an identifiable local need. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Jul 2026
Decision
Expected by 2 Sept 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 93.

The consultation period closed on 13 Aug 2026.

Site constraints 17

Coal mining legacy areaIPC and RAS Sites BHP Petroleum LtdLocal Wildlife Sites Talacre Abbey and WoodsIPC and RAS Sites Evergreen ResourcesDevelopment Control North TeamCounty Boundary Flintshire Unitary Authority County BoundaryWindfarm Consultation Area Consult National Air Traffic Services.Existing Waste Management Site Consult Environmental HealthAreas of Advertisement ControlHistoric Par Talacre Designated Boundary
Registered park or garden: Talacre
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Ancient woodland 5 m away: Restored Ancient Woodland Site
Inside the 15 m buffer standing advice asks for from the boundary.
National policy refuses development that would cause loss or deterioration of ancient woodland or ancient trees unless there are wholly exceptional reasons.
Special protection area 119 m away: The Dee Estuary (Wales)
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
National infrastructure project 561 m away: HyNet Carbon Dioxide Pipeline
The site is 561 m from the project boundary. Pipeline, decided. The project page says whether consent was granted. Also within 2 km: Hynet North West Hydrogen Pipeline (at pre-application, 561 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
SSSI 119 m away: Dee Estuary / Aber Afon Dyfrdwy
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Coal mining legacy areaCouncil record
Recorded by the council for this site.
Council site ↗
IPC and RAS Sites BHP Petroleum LtdCouncil record
Recorded by the council for this site.
Council site ↗
Local Wildlife Sites Talacre Abbey and WoodsCouncil record
Recorded by the council for this site.
Council site ↗
IPC and RAS Sites Evergreen ResourcesCouncil record
Recorded by the council for this site.
Council site ↗
Development Control North TeamCouncil record
Recorded by the council for this site.
Council site ↗
County Boundary Flintshire Unitary Authority County BoundaryCouncil record
Recorded by the council for this site.
Council site ↗
Windfarm Consultation Area Consult National Air Traffic Services.Council record
Recorded by the council for this site.
Council site ↗
Existing Waste Management Site Consult Environmental HealthCouncil record
Recorded by the council for this site.
Council site ↗
Areas of Advertisement ControlCouncil record
Recorded by the council for this site.
Council site ↗
Historic Par Talacre Designated BoundaryCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
Coalfield, development low risk area.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £104,000 in July 2003. Semi-detached house, freehold.

31 July 2003£104,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area84 m² (904 sq ft)
Energy ratingE (42 out of 100), could reach C
PropertySemi-detached house, 4 habitable rooms
BuiltBefore 1900
HeatingBoiler and radiators, LPG
WallsGranite or whinstone, as built, no insulation (assumed)

From the energy performance certificate lodged in August 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Flintshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Flintshire
Application type
Outline
Postcode
CH8 9JS
Received
8 Jul 2026
Validated
8 Jul 2026
Ward
Flintshire Ward Llanasa and Trelawynd
Parish
Flintshire Community Llanasa Community Council
Case officer
Show
Target decision
2 Sept 2026
Applicant
Show
Agent
Chris Parry

Decision outlook

Day 93, past the statutory target. 80% of new homes in Flintshire are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 8 Oct 2026.

Day 9337 days past the 56-day target
61%decided within 8 weeks
57%approved
58decided in the last year

Plota live figures for new homes decided by Flintshire in the last twelve months, from validation. Flintshire decision record →

Consultation & key dates

Alt. reference
PP-14929151
Comments by
13 Aug 2026
Site or press notice
9 Jul 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.