Seabank Power Station Severn Road Avonmouth Bristol BS10 7SP Data via plota.co.uk

26/14587/REQU - Requirement for Development Order Pending consideration

Proposal

The National Grid (Hinkley Point C Connection Project) Order 2016 (As amended) Formal Submission to discharge Requirement 28 - Seabank substation Flood Defence works located at Severn Road, Bristol, BS10 7SP. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Oct 2026
Decision
Expected by 25 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 21 Dec 2026, from Bristol's recent utility and infrastructure works.

Comments are open until 30 Nov 2026

Comment on this application ↗

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project about 450 m away: Hinkley Point C Connection
The site is about 450 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: Hinkley Point C Connection Project Material Change (at pre-application, about 456 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Hallen built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 7 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bristol - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bristol
Application type
Requirement for Development Order
Postcode
BS10 7SP
Received
30 Oct 2026
Validated
30 Oct 2026
Ward
Avonmouth & Lawrence Weston
Parish
Avonmouth And Lawrence Weston
Target decision
25 Dec 2026
Agent
Arup (on Behalf Of National Grid)

Decision outlook

Day 24 of the 56-day target. Bristol usually decides utility and infrastructure works by day 52.

Day 2432 days to the 56-day target
72%decided within 8 weeks
79%approved
84decided in the last year

Plota live figures for utility and infrastructure works decided by Bristol in the last twelve months, from validation. Bristol decision record →

Public comments

No public comments yet.

Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15328682
Planning Portal ref
PP-15328682
Comments by
30 Nov 2026
Statutory expiry
25 Dec 2026
Bristol
Planning Authority Score
5.8/10
Average
#109 of 296 overall
Relevant to this application:
Householder decisions

Bristol is #112 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Bristol decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #190 of 296
92%
Householder approved
Above avg (90%) #149 of 296
71%
Decided in 8 weeks
Above avg (63%) #112 of 296
37%
Extended time limit
Below avg (41%) #118 of 296
74%
Minor dwellings approved
374 decided (1-9 homes)
93%
Major dwellings approved
30 decided (10+ homes)
82%
Change of use approved
150 decided
2,098
Total decisions
293 refused in the year to March 2026