Replacement Overhead Power Line South Of Sewage Treatment Works Lane From Abbey House To Sewage Works… Data via plota.co.uk

01746/26/FMB - Form B - Overhead/Electricity Decided

Proposal

Form B application - Installation of 2x terminal poles and the recovery of existing poles and overhead conductors. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Oct 2026
✓
Consultation
15 Oct 2026
Decision
Target date was 18 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 3 Dec 2026 and 15 Dec 2026, from East Lindsey's recent utility and infrastructure works.

The consultation period closed on 11 Nov 2026.

Site constraints 3

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 313 m away: Viking CCS Pipeline
The site is about 313 m from the project boundary. Pipeline, decided. The project page says whether consent was granted. Also within 2 km: Grimsby to Walpole (at pre-application, the site is inside its boundary).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
2 listed buildings within 150 m of the postcode pin.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 13 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Lindsey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Form B - Overhead/Electricity
Received
8 Oct 2026
Validated
8 Oct 2026
Ward
Grimoldby Ward
Parish
North Cockerington
Case officer
Show
Target decision
18 Nov 2026
Applicant
Show

Decision outlook

Day 46 of the 56-day target. East Lindsey usually decides utility and infrastructure works by day 57.

Day 4611 days to the predicted decision (day 57)
44%decided within 8 weeks
100%approved
27decided in the last year

Plota live figures for utility and infrastructure works decided by East Lindsey in the last twelve months, from validation. East Lindsey decision record →

Public comments

No public comments yet.

4 neighbours consulted · Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Neighbours
15 Oct 2026
Consultation
15 Oct 2026
Comments by
11 Nov 2026
Site or press notice
21 Oct 2026
Statutory expiry
18 Nov 2026
Env. assessment
No
East Lindsey
Planning Authority Score
4.5/10
Below average
#171 of 296 overall
Relevant to this application:
Householder decisions

East Lindsey is #182 of 296 councils on householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Lindsey decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #36 of 296
94%
Householder approved
Above avg (90%) #105 of 296
60%
Decided in 8 weeks
Below avg (63%) #182 of 296
47%
Extended time limit
Above avg (41%) #206 of 296
86%
Minor dwellings approved
146 decided (1-9 homes)
100%
Major dwellings approved
24 decided (10+ homes)
95%
Change of use approved
109 decided
817
Total decisions
53 refused in the year to March 2026