DAINTRY HALL DAY NURSERY Church Lane, North Rode, Congleton, Cheshire East, CW12 2PE Data via plota.co.uk
Description
Discharge of Conditions 09 (Tree Protection), 10 (Arboricultural Method Statement), 15 (Ecological Enhancement Plan) and 16 (Habitat Creation BNG) on approval i) Alterations and extension to the existing Grade II Listed Hall; to... Data via plota.co.uk
Last checked
Associated applications 3
- ConditionsDischarge of Conditions 09 (Tree Protection), 10 (Arboricultural Method Statement), 15…This application25/4275/DSC
Show 1 more · 1 approved
Site constraints 3
Show all 2 with distances
- 1 mRode Hall FarmhouseGrade II
- 30 mRange of Farmbuildings at Rode Hall FarmGrade II
Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Cheshire East - and every UK council - as a live feed, an API, or a bulk CSV export.
Historical activity at this location
4 previous applications on record - archival context, not part of the live application.
Previous applications at this address
Nearby activity
Cheshire East is one of the slowest councils in England for householder decisions, ranking #268 out of 296. The council extends the time limit on 65% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).
Referenced application
Council archive
Daintry Hall, Church Lane, North Rode, Congleton, CW12 2PE
i) Alterations and extension to the existing Grade II Listed Hall; to replace kitchen and welfare facilities; to provide larger hall space, entrance lobby and 1st floor management office and ii) Construction of an independent single storey pavilion with kitchen and welfare facilities, external picnic area and pickleball court / events amd activities area designed in a contemporary style using natural materials and extensive use of renewable energy.
- Received
- 12 Jun 2024
- Outcome
- Pending
