Former Cadet Centre 8 Blind Lane Wimborne BH21 1ND Data via plota.co.uk

P/VOC/2026/05224 - Variation of Condition Under Officer Consideration

Proposal

Demolition of the existing building and Construction of detached building to create office space. Double storey element interlinked to single storey building with associated Bin Store. Form new vehicular access and sliding gates., Addition of Solar PV & Air Source Heat Pump (P/FUL/2025/06557), With Variation of Condition 2, 6 & 7 - to include a revised parking and cycle layout Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Sept 2026
Decision
Target date was 16 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 18 Nov 2026, from Dorset's recent commercial and major works.

The consultation period closed on 26 Oct 2026.

Documents 9

Consultation & comments 4

PDF Objector’s name hidden Show 13kb · 22 Oct 2026 View ↗
PDF Objector’s name hidden Show 3kb · 22 Oct 2026 View ↗
PDF Objector’s name hidden Show 255kb · 16 Oct 2026 View ↗
PDF Objector’s name hidden Show 3kb · 16 Oct 2026 View ↗

All documents on the council site ↗

Associated applications 2

Site constraints 6

Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Public footpath 27 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Also on the record
Conservation area 26 m away: Wimborne Minster Conservation Area; 4 listed buildings within 150 m; Inside the Wimborne Minster built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dorset - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dorset
Application type
Variation of Condition
Postcode
BH21 1ND
Received
21 Sept 2026
Validated
21 Sept 2026
Ward
Wimborne Minster Ward
Parish
Wimborne Minster
Case officer
Show
Decision level
Delegated
Applicant
Show

Decision outlook

Day 58, past the statutory target. 77% of commercial and major works in Dorset are decided within thirteen weeks, which runs to 21 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 11 Nov 2026.

Day 582 days past the 56-day target
56%decided within 8 weeks
91%approved
6%go to committee

Plota live figures for commercial and major works decided by Dorset in the last twelve months, from validation. Dorset decision record →

Consultation & key dates

Comments by
26 Oct 2026
Dorset
Planning Authority Score
7.5/10
Good
#44 of 296 councils
Relevant to this application:
Householder decisions

Dorset is faster than most councils at deciding householder applications, ranking #51 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Dorset decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #80 of 296
95%
Householder approved
Above avg (90%) #74 of 296
78%
Decided in 8 weeks
Above avg (63%) #51 of 296
35%
Extended time limit
Below avg (41%) #102 of 296
81%
Minor dwellings approved
344 decided (1-9 homes)
85%
Major dwellings approved
40 decided (10+ homes)
76%
Change of use approved
85 decided
2,781
Total decisions
233 refused in the year to March 2026