Cherry Holt Farm, Ralphs Lane, Frampton, Boston PE20 1RJ Data via plota.co.uk

B/26/0077 - Notification of Proposed Development Approved

Proposal

Notification under the Electronic Communications Code Regulations 2003 (as amended) to utilise its permitted development rights as defined in Part 16 of Schedule 2 of the Town and Country Planning (General Permitted Development)(England) Order 2015 (as amended) for the installation of a 9m light wooden pole Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Feb 2026
✓
Approved
16 Feb 2026

Approved on 16 Feb 2026 · Delegated Decision · Last checked 24 Sept 2026

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Also on the record
National infrastructure project about 1984 m away: Outer Dowsing Offshore Wind (Generating Station); Inside the Kirton End built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 1, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Boston - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Boston
Application type
Notification of Proposed Development
Postcode
PE20 1RJ
Received
11 Feb 2026
Validated
11 Feb 2026
Ward
Kirton And Frampton Ward
Parish
Wigtoft
Case officer
Show
Target decision
10 Mar 2026
Decision
No Objection
Decision date
16 Feb 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 5 days from validation, 4 days slower than Boston's median of 1 for utility and infrastructure works. Approved, as 97% of utility and infrastructure works here are.

83%decided within 8 weeks
97%approved
29decided in the last year

Plota live figures for utility and infrastructure works decided by Boston in the last twelve months, from validation. Boston decision record →

Public comments

No public comments yet.

Last counted 24 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
10 Mar 2026
Env. assessment
No