Lenzing Fibers Ltd Energy Park Way Grimsby North East Lincolnshire DN31 2TT Data via plota.co.uk

DM/0914/23/CND - Discharge Condition Approved

Proposal

Details in Discharge of Conditions 3 (Internal Access, Manoeuvring and Parking) and 8 (Permanent Drainage) pursuant to DM/0850/21/FUL as amended by . Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 18 Sept 2023
✓
Consultation
26 Oct 2023
✓
Approved
30 Sept 2024

Approved on 30 Sept 2024 · Delegated Decision · Last checked 16 Oct 2026

Documents 41

Statements & assessments 18

All documents on the council site ↗

Associated applications 7

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project 414 m away: South Humber Bank Energy Centre
The site is 414 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Stallingborough Combined Cycle Gas Turbine (CCGT) generating plant and Carbon Capture Plant (CCP) (at pre-application, the site is inside its boundary); H2East Pipeline: Humber to Nottinghamshire (at pre-application, the site is inside its boundary).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Grimsby built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North East Lincs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Discharge Condition
Postcode
DN31 2TT
Received
around 18 Sept 2023
Validated
18 Sept 2023
Ward
Wold
Parish
Healing Parish Council
Case officer
Show
Target decision
30 Sept 2024
Decision
Conditions Complied With
Decision date
30 Sept 2024
Decision level
Delegated Decision
Applicant
Show
Agent
Ross Davy Associates

How this decision compares

Decided in 378 days from validation, 348 days slower than North East Lincs's median of 30 for discharge of conditions. Approved, as 100% of discharge of conditions here are.

93%decided within 8 weeks
100%approved
92decided in the last year

Plota live figures for discharge of conditions decided by North East Lincs in the last twelve months, from validation. North East Lincs decision record →

Public comments

No public comments yet.

Last counted 16 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-12464551
Planning Portal ref
PP-12464551
Consultation
26 Oct 2023
Comments by
19 Nov 2023
Statutory expiry
13 Nov 2023
Env. assessment
No
North East Lincs
Planning Authority Score
5.3/10
Average
#132 of 296 councils
Relevant to this application:
Householder decisions

North East Lincs ranks #151 out of 296 councils for householder decision speed. 52% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North East Lincs decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #22 of 296
97%
Householder approved
Above avg (90%) #35 of 296
64%
Decided in 8 weeks
Above avg (63%) #151 of 296
52%
Extended time limit
Above avg (41%) #235 of 296
95%
Minor dwellings approved
43 decided (1-9 homes)
87%
Major dwellings approved
15 decided (10+ homes)
82%
Change of use approved
22 decided
467
Total decisions
24 refused in the year to March 2026