Orchard End New Lane Eagland Hill Pilling Preston Lancashire PR3 6BA Data via plota.co.uk

25/00967/AGR - Agricultural Notification Approved

Proposal

Prior approval for erection of agricultural storage (midden) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Nov 2025
✓
Consultation
26 Nov 2025
✓
Approved
18 Dec 2025

Approved on 18 Dec 2025 · Delegated Decision · Last checked 9 Oct 2026

Site constraints 6

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project 863 m away: Preesall Saltfield Underground Gas Storage
The site is 863 m from the project boundary. Underground gas storage, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Public footpath 30 m away; Nature improvement area: Morecambe Bay Limestones and Wetlands; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wyre - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wyre
Application type
Agricultural Notification
Postcode
PR3 6BA
Received
25 Nov 2025
Validated
25 Nov 2025
Ward
Pilling
Parish
Pilling
Case officer
Show
Target decision
23 Dec 2025
Decision
Prior approval not determined
Decision date
18 Dec 2025
Decision level
Delegated Decision
Applicant
Show
Agent
ML Planning Consultancy Ltd

How this decision compares

Decided in 23 days from validation, 5 days faster than Wyre's median of 28 for prior approvals. Approved, as 78% of prior approvals here are.

94%decided within 8 weeks
78%approved
73decided in the last year

Plota live figures for prior approvals decided by Wyre in the last twelve months, from validation. Wyre decision record →

Public comments

No public comments yet.

Last counted 9 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14517556
Planning Portal ref
PP-14517556
Consultation
26 Nov 2025
Comments by
17 Dec 2025
Statutory expiry
23 Dec 2025
Env. assessment
No
Wyre
Planning Authority Score
1.2/10
Poor
#288 of 296 overall
Relevant to this application:
Householder decisions

Wyre is one of the slowest councils in England for householder decisions: #272 of 296 on speed. The council extends the time limit on 66% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Wyre decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #243 of 296
88%
Householder approved
Below avg (90%) #228 of 296
38%
Decided in 8 weeks
Below avg (63%) #272 of 296
66%
Extended time limit
Above avg (41%) #281 of 296
56%
Minor dwellings approved
41 decided (1-9 homes)
67%
Major dwellings approved
6 decided (10+ homes)
75%
Change of use approved
52 decided
539
Total decisions
90 refused in the year to March 2026