Sea Life Adventure Centre Eastern Esplanade Southend-on-sea Essex SS1 2ER Data via plota.co.uk

25/01738/AMDT - Material Amendment Refused

Proposal

Application to vary conditions 02 (Approved Plans) Replace the drawings 162CP01- REV C,162CP02- REV A, 162CP03- REV D with updated drawings 162CP01- REV E,162CP02- REV B, 162CP03- REV F (Material Amendment of Planning Permission dated 10/09/2025) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Dec 2025
✗
Refused
26 Feb 2026
Appeal
Not lodged

Refused on 26 Feb 2026 · Development Control Committee · Last checked 6 Oct 2026

Planning committee

Decided by Southend Planning Committee on 25 Feb 2026.

Refused

Against officer advice: officers had recommended approval.

  • Officers advised approval because the amended canopy would have little effect on the area and would not harm pedestrian access.
  • A councillor objected that the canopy narrowed the footway and created accessibility concerns; no neighbour letters were received.
  • The committee refused permission because the canopy and nearby street furniture would significantly impede accessible movement along the public footway.
Read how the committee decided The proposed changes, site history, officer advice, public comments and committee’s refusal. Includes the meeting recording

Source: Plota analysis of Southend's committee minutes of 25 Feb 2026.

Associated applications 2

  • Part of

    Approvedcouncil archive
    • VariationApplication to vary conditions 02 (Approved Plans) Replace the drawings 162CP01- REV…RefusedThis application25/01738/AMDT

Site constraints 9

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Ramsar wetland 37 m away: Benfleet and Southend Marshes
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI 37 m away: Benfleet and Southend Marshes SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Tilbury to Southend 23 m away
Matters where it crosses or adjoins the site; the route and its margin are protected.
Also on the record
2 listed buildings within 150 m; Flood defence 19 m away (wall, designed for a 1 in 1000 year flood); Inside the Southend-on-Sea built-up area; Conservation area 93 m away: Eastern Esplanade Conservation Area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southend - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Southend
Application type
Material Amendment
Postcode
SS1 2ER
Received
10 Dec 2025
Validated
10 Dec 2025
Ward
Kursaal
Case officer
Show
Target decision
27 Feb 2026
Decision
Refuse Permission
Decision date
26 Feb 2026
Decision level
Development Control Committee
Applicant
Show
Agent
SKArchitects

How this decision compares

Decided in 78 days from validation, 22 days slower than Southend's median of 56 for amendments. Refused, as 18% of amendments here are.

67%decided within 8 weeks
82%approved
5%go to committee

Plota live figures for amendments decided by Southend in the last twelve months, from validation. Southend decision record →

Public comments

No public comments yet.

18 neighbours consulted · Last counted 6 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Committee
25 Feb 2026
Statutory expiry
4 Feb 2026
Env. assessment
No
Southend
Planning Authority Score
3.8/10
Below average
#209 of 296 overall
Relevant to this application:
Householder decisions

Southend is #155 of 296 councils on householder decision speed. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Southend decision statistics
Based on MHCLG data, the year to March 2026
80%
Overall approval rate
Below avg (87%) #261 of 296
88%
Householder approved
Below avg (90%) #224 of 296
64%
Decided in 8 weeks
Above avg (63%) #155 of 296
43%
Extended time limit
Above avg (41%) #173 of 296
62%
Minor dwellings approved
109 decided (1-9 homes)
78%
Major dwellings approved
9 decided (10+ homes)
56%
Change of use approved
82 decided
904
Total decisions
177 refused in the year to March 2026