Kedge House, Starboard Way and Winch House, Tiller Road, London E14 8PS Data via plota.co.uk

25/3670/K - Consultation by other Borough\LDDC Decided

Proposal

Demolition of the existing buildings and structures and construction of residential dwellings (Use Class C3), community/commercial floorspace (Use Class E and F), public realm works, landscaping, access, servicing, parking and associated works. This application is accompanied by an Environmental Impact Assessment. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Nov 2025
Decision
Target date was 24 Nov 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 18 Nov 2026; it is now day 380.

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Archaeological priority area: Tower Hamlets APA 3.1
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 26 m away: Thames Tideway Tunnel
The site is about 26 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: Silvertown Tunnel (decided, about 1569 m); London Strategic Heat Main Project (at pre-application, about 1427 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Tower Hamlets built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Greenwich - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Greenwich
Application type
Consultation by other Borough\LDDC
Postcode
E14 8PS
Received
3 Nov 2025
Validated
3 Nov 2025
Case officer
Show
Target decision
24 Nov 2025
Applicant
Show

Decision outlook

Day 380, past the statutory target. 84% of other in Greenwich are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 13 Nov 2026.

Day 380324 days past the 56-day target
65%decided within 8 weeks
95%approved
2,215decided in the last year

Plota live figures for other decided across the UK in the last twelve months, from validation; too few recent other in Greenwich to go on. Greenwich decision record →

Public comments

No public comments yet.

Last counted 13 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
24 Nov 2025
Env. assessment
No
Greenwich
Planning Authority Score
5.4/10
Average
#123 of 296 councils
Relevant to this application:
Householder decisions

Greenwich is faster than most councils at deciding householder applications, ranking #76 out of 296. Only 29% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Greenwich is also one of the strictest councils - it refuses more householder applications than almost any other, with only 78% approved vs 90% nationally.

One of the strictest councils
only 78% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Greenwich decision statistics
Based on MHCLG data, the year to March 2026
77%
Overall approval rate
Below avg (87%) #278 of 296
78%
Householder approved
Below avg (90%) #287 of 296
75%
Decided in 8 weeks
Above avg (63%) #76 of 296
29%
Extended time limit
Below avg (41%) #49 of 296
60%
Minor dwellings approved
114 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
66%
Change of use approved
195 decided
1,468
Total decisions
331 refused in the year to March 2026