Victoria Road Crossover Box Site Land Bound By Victoria Road, School Road And Chase Road London W3 6UL Data via plota.co.uk

254117OPDCOB - OPDC Consultation by Other Boroughs No Objection

Proposal

Application under Schedule 17 of the High Speed Rail (London-West Midlands) Act 2017 for works associated with the Victoria Road Crossover Box and Ancillary Shaft comprising an auto-transformer station, artificial lighting equipment, vehicle parking areas, earthworks (including retaining walls and hard surfacing) and walls and fences. (out of borough) Data via plota.co.uk

View original council record ↗Last checked

Ealing Council is publishing its applications late: so far it has put about three fifths of those it has numbered since early September on its register. Plota adds each one as soon as the council publishes it.

Application progress

✓
Received
27 Oct 2025
Decision
Target date was 16 Nov 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 392.

Site constraints 5

Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
National infrastructure project about 1.8 km away: Thames Tideway Tunnel; Inside the Ealing built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
OPDC Consultation by Other Boroughs
Postcode
W3 6UL
Received
27 Oct 2025
Validated
27 Oct 2025
Ward
Out Of Borough
Case officer
Show
Target decision
16 Nov 2025
Decision level
Delegated Decision

Decision outlook

Day 392, past the statutory target. 83% of other in Ealing are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 20 Nov 2026.

Day 392336 days past the 56-day target
65%decided within 8 weeks
95%approved
2,220decided in the last year

Plota live figures for other decided across the UK in the last twelve months, from validation; too few recent other in Ealing to go on. Ealing decision record →

Public comments

No public comments yet.

Last counted 20 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
16 Nov 2025
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 overall
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications: #264 of 296 on speed. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026