The Laboratory Building, RHS Wisley Gardens, Wisley, GU23 6QS Data via plota.co.uk

26/P/00875 - Listed Building Consent Approved

Proposal

Listed building consent for the addition of 2 no. galvanised steel water butts and associated pipe works. (description amended 28 Jul 2026) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Jun 2026
✓
Validated
1 Jul 2026
✓
Consultation
3 Jul 2026
✓
Approved
25 Aug 2026

Approved on 25 Aug 2026 · Delegated · Last checked 27 Aug 2026

Site constraints 9

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Registered park or garden: Royal Horticultural Society's Gardens, Wisley
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 247 m away: M25 junction 10/A3 Wisley interchange improvement
The site is 247 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Special protection area 285 m away: Thames Basin Heaths
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
1 listed building within 150 m; SSSI 285 m away: Ockham and Wisley Commons SSSI; Priority habitat 25 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Guildford - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Guildford
Application type
Listed Building Consent
Postcode
GU23 6QS
Received
25 Jun 2026
Validated
1 Jul 2026
Ward
Send & Lovelace
Parish
Wisley
Case officer
Show
Target decision
26 Aug 2026
Decision
Approve
Decision date
25 Aug 2026
Decision level
Delegated
Applicant
Show
Agent
Philip Hughes Associates

How this decision compares

Decided in 55 days from validation, 20 days faster than Guildford's median of 75 for listed building works. Approved, as 88% of listed building works here are.

31%decided within 8 weeks
88%approved
101decided in the last year

Plota live figures for listed building works decided by Guildford in the last twelve months, from validation. Guildford decision record →

Public comments

No public comments yet.

Last counted 27 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15037541
Planning Portal ref
PP-15037541
Neighbours
30 Jul 2026
Consultation
3 Jul 2026
Comments by
31 Jul 2026
Site or press notice
10 Jul 2026
Env. assessment
No
Guildford
Planning Authority Score
1/10
Poor
#292 of 296 overall
Relevant to this application:
Other decisions

Guildford is one of the slowest councils in England for householder decisions: #282 of 296 on speed. The council extends the time limit on 64% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (86%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Guildford decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #221 of 296
86%
Householder approved
Below avg (90%) #243 of 296
31%
Decided in 8 weeks
Below avg (63%) #282 of 296
64%
Extended time limit
Above avg (41%) #276 of 296
79%
Minor dwellings approved
156 decided (1-9 homes)
67%
Major dwellings approved
6 decided (10+ homes)
66%
Change of use approved
47 decided
1,348
Total decisions
219 refused in the year to March 2026