Electric Tower At Parcel 7133 Church Road Maisemore Gloucester Gloucestershire Data via plota.co.uk

26/00001/S37EA - S73 of the Electricity Act Awaiting decision

Proposal

European Energy have applied for a 49.9MW PV scheme (Planning reference: ). In order to accommodate this connection, it is proposed to loop connect the customer by dismantling existing tower PAA11 and constructing a replacement 9-arm tower together with two new gantry structures, where short lengths of cable will be installed down to serve as a point of connection Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Apr 2026
✓
Validated
21 May 2026
✓
Consultation
11 Sept 2026
Decision
Target date was 16 Jul 2026

As of 27 Oct 2026, the council is no longer showing this application on their planning portal. It may have been withdrawn or re-listed under a different reference. We've stopped checking it for updates.

Associated applications 2

  • Part of

    FullApprovedcouncil archive
    • VariationEuropean Energy have applied for a 49.9MW PV scheme. In order to accommodate this connection…This application26/00001/S37EA

Site constraints 5

Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
8 listed buildings within 150 m of the postcode pin
Nearest: Maisemore Court, Old Court, New Court, Grade II*, about 36 m from the postcode pin · 2 Grade II*, 6 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 8 with distances
Historic England ↗
Scheduled monument about 135 m away: Churchyard cross in St Giles churchyard
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Also on the record
Tree preservation order about 0 m away: Church Road, Maisemore.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tewkesbury - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Tewkesbury
Application type
S73 of the Electricity Act
Received
1 Apr 2026
Validated
21 May 2026
Ward
Highnam With Haw Bridge
Parish
Maisemore
Case officer
Show
Target decision
16 Jul 2026

Decision outlook

Day 186, past the statutory target. 78% of amendments in Tewkesbury are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 21 Oct 2026.

Day 186130 days past the 56-day target
64%decided within 8 weeks
81%approved
123decided in the last year

Plota live figures for amendments decided by Tewkesbury in the last twelve months, from validation. Tewkesbury decision record →

Public comments

No public comments yet.

Last counted 21 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
11 Sept 2026
Comments by
25 Sept 2026
Statutory expiry
16 Jul 2026
Env. assessment
No
Tewkesbury
Planning Authority Score
3.7/10
Below average
#212 of 296 overall
Relevant to this application:
Householder decisions

Tewkesbury is #197 of 296 councils on householder decision speed. 50% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Tewkesbury decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #144 of 296
93%
Householder approved
Above avg (90%) #139 of 296
57%
Decided in 8 weeks
Below avg (63%) #197 of 296
50%
Extended time limit
Above avg (41%) #228 of 296
69%
Minor dwellings approved
89 decided (1-9 homes)
100%
Major dwellings approved
12 decided (10+ homes)
86%
Change of use approved
37 decided
689
Total decisions
74 refused in the year to March 2026