Electric Tower At Parcel 7133 Church Road Maisemore Gloucester Gloucestershire Data via plota.co.uk
Proposal
European Energy have applied for a 49.9MW PV scheme (Planning reference: ). In order to accommodate this connection, it is proposed to loop connect the customer by dismantling existing tower PAA11 and constructing a replacement 9-arm tower together with two new gantry structures, where short lengths of cable will be installed down to serve as a point of connection Data via plota.co.uk
Application progress
As of 27 Oct 2026, the council is no longer showing this application on their planning portal. It may have been withdrawn or re-listed under a different reference. We've stopped checking it for updates.
Documents 3
Statements & assessments 1
Plans & drawings 1
Consultation & comments 1
Associated applications 2
Part of
- VariationEuropean Energy have applied for a 49.9MW PV scheme. In order to accommodate this connection…This application26/00001/S37EA
Site constraints 5
Show all 8 with distances
- 36 mMaisemore Court, Old Court, New CourtGrade II*
- 121 mStables, About 29 Metres East of Maisemore CourtGrade II
- 128 mCross Base in Churchyard, About 4.5m South of South-East Corner of Porch, Church of St GilesGrade II
- 129 mVallender and Syms Monuments, in Churchyard, About 7m South of East End of Nave, Church of St GilesGrade II
- 133 mWadley Monument in Churchyard About 2 Metres South West of Porch, Church of St GilesGrade II
- 138 mTwo Monuments in Churchyard, About 1m South of Tower, Church of St GilesGrade II
- 139 mGriffiths Monument in Churchyard, About 7m South of Chancel, Church of St GilesGrade II
- 143 mChurch of St GilesGrade II*
Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Tewkesbury - and every UK council - as a live feed, an API, or a bulk CSV export.
Nearby new applications
Important details
- Council
- Tewkesbury
- Application type
- S73 of the Electricity Act
- Received
- 1 Apr 2026
- Validated
- 21 May 2026
- Ward
- Highnam With Haw Bridge
- Parish
- Maisemore
- Case officer
- Show
- Target decision
- 16 Jul 2026
Decision outlook
Day 186, past the statutory target. 78% of amendments in Tewkesbury are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 21 Oct 2026.
Plota live figures for amendments decided by Tewkesbury in the last twelve months, from validation. Tewkesbury decision record →
Public comments
No public comments yet.
Last counted 21 Oct 2026
Consultation & key dates
- Consultation
- 11 Sept 2026
- Comments by
- 25 Sept 2026
- Statutory expiry
- 16 Jul 2026
- Env. assessment
- No
Historical activity at this location
2 nearby applications on record - archival context, not part of the live application.
Tewkesbury is #197 of 296 councils on householder decision speed. 50% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).
Track this application
Electric Tower At Parcel 7133 Church Road Maisemore Gloucester Gloucestershire
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.
Check your email
Referenced application
Council archive
Land South Of Maisemore Maisemore Gloucester Gloucestershire GL2 8HH
The construction of a solar photovoltaic ('PV') farm and associated infrastructure, including inverters, security cameras, fencing, access tracks, landscaping and ecological enhancement areas.
- Received
- 29 Mar 2022
- Decided
- 6 Mar 2023
- Outcome
- Approved
