Land Adjacent To Townsend House Townsend Hill Winkleigh Devon Data via plota.co.uk

1/0698/2026/FUL - Full Application Application is being considered

Proposal

Erection of 1no. dwelling and outbuilding with associated access, parking and landscaping, with creation of new access and parking for adjacent property Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Sept 2026
✓
Consultation
15 Sept 2026
Decision
Expected by 6 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 6 Nov 2026 and 26 Nov 2026, from Torridge's recent new homes.

Comments are open until 9 Oct 2026

Comment on this application ↗

Site constraints 5

Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Scheduled monument 118 m away: Croft Castle
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Also on the record
2 listed buildings within 150 m; Inside the Winkleigh built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Torridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Torridge
Application type
Full Application
Received
11 Sept 2026
Validated
11 Sept 2026
Ward
Winkleigh
Parish
Winkleigh
Case officer
Show
Target decision
6 Nov 2026
Applicant
Show
Agent
Adams Planning And Project Services Ltd

Decision outlook

Day 28 of the 56-day target. Torridge usually decides new homes by day 56.

Day 2828 days to the 56-day target
52%decided within 8 weeks
90%approved
103decided in the last year

Plota live figures for new homes decided by Torridge in the last twelve months, from validation. Torridge decision record →

Public comments

No public comments yet.

7 neighbours consulted · Last counted 6 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15219385
Planning Portal ref
PP-15219385
Neighbours
15 Sept 2026
Consultation
15 Sept 2026
Comments by
9 Oct 2026
Site or press notice
23 Sept 2026
Statutory expiry
6 Nov 2026
Env. assessment
No
Torridge
Planning Authority Score
7.6/10
Good
#40 of 296 councils
Relevant to this application:
Householder decisions

Torridge is faster than most councils at deciding householder applications, ranking #55 out of 296. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Torridge decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #184 of 296
98%
Householder approved
Above avg (90%) #25 of 296
78%
Decided in 8 weeks
Above avg (63%) #55 of 296
38%
Extended time limit
Below avg (41%) #133 of 296
72%
Minor dwellings approved
155 decided (1-9 homes)
85%
Major dwellings approved
13 decided (10+ homes)
82%
Change of use approved
11 decided
554
Total decisions
71 refused in the year to March 2026