Guardian House Borough Road Godalming GU7 2AE Data via plota.co.uk

WA/2025/00471 - FULL APPLICATION Approved

Proposal

Erection of extension and alterations including reconfiguration of cycle and parking spaces and provision of an external play area in association with consented use as a nursery. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 Feb 2025
✓
Approved
21 May 2025

Approved on 21 May 2025 · Last checked 20 Oct 2026

Site constraints 12

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Godalming Town Centre Conservation Area conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
3 listed buildings within 150 m
Nearest: Bridge Over River Wey, Grade II, 57 m away · 3 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 3 with distances
Historic England ↗
Also on the record
Public footpath 29 m away; Radon affected area, class 2; Flood defence 11 m away (natural high ground, designed for a 1 in 5 year flood); SSSI 498 m away: Charterhouse to Eashing SSSI; Inside the Godalming built-up area; Green belt 41 m away: London; Priority habitat 23 m away: Deciduous woodland; Open access land 48 m away: Access Land - Combined Open Country, Registered Common Land and Section 16 Dedicated Land.
Not affected
No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £2,200,000 in November 2021. Other property, freehold.

1 November 2021£2,200,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Waverley - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Waverley
Application type
FULL APPLICATION
Postcode
GU7 2AE
Received
28 Feb 2025
Validated
28 Feb 2025
Ward
Godalming Binscombe & Charterhouse
Parish
Godalming
Case officer
Show
Target decision
23 May 2025
Decision
Granted
Decision date
21 May 2025
Agent
Archie Simon
Freehold owner
Show

How this decision compares

Decided in 82 days from validation, 20 days slower than Waverley's median of 62 for full applications. Approved, as 81% of full applications here are.

45%decided within 8 weeks
81%approved
284decided in the last year

Plota live figures for full applications decided by Waverley in the last twelve months, from validation. Waverley decision record →

Consultation & key dates

Comments by
11 Apr 2025
Waverley
Planning Authority Score
5.3/10
Average
#133 of 296 overall
Relevant to this application:
Householder decisions

Waverley is #144 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Waverley decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #163 of 296
93%
Householder approved
Above avg (90%) #141 of 296
66%
Decided in 8 weeks
Above avg (63%) #144 of 296
38%
Extended time limit
Below avg (41%) #134 of 296
70%
Minor dwellings approved
151 decided (1-9 homes)
59%
Major dwellings approved
17 decided (10+ homes)
67%
Change of use approved
21 decided
1,378
Total decisions
161 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Freehold owner and leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.