Land North Of A12 East Of Waltham Road Boreham Chelmsford Data via plota.co.uk

22/00001/REQ/25 Pending Consideration

Proposal

Requirement 23 (Fencing and other means of enclosure) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Nov 2026
Decision
Expected by 10 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 10 Jan 2027, from Chelmsford's recent extensions.

Site constraints 2

National infrastructure project: A12 Chelmsford to A120 Widening Scheme
The site is inside the project boundary. Highway, decided. The project page says whether consent was granted. Also within 2 km: Longfield Solar Farm (decided, 75 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 17 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Chelmsford - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Chelmsford
Received
16 Nov 2026
Validated
16 Nov 2026
Target decision
10 Jan 2027

Decision outlook

Day 7 of the 56-day target. Chelmsford usually decides extensions by day 55.

Day 749 days to the 56-day target
74%decided within 8 weeks
88%approved
813decided in the last year

Plota live figures for extensions decided by Chelmsford in the last twelve months, from validation. Chelmsford decision record →

Public comments

No public comments yet.

Last counted 22 Nov 2026

Read the comments on the council site ↗

Chelmsford
Planning Authority Score
7.4/10
Good
#45 of 296 overall
Relevant to this application:
Householder decisions

Chelmsford is one of the fastest councils in England for householder decisions: #23 of 296 on speed. Only 21% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Chelmsford decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #167 of 296
90%
Householder approved
Above avg (90%) #188 of 296
84%
Decided in 8 weeks
Above avg (63%) #23 of 296
21%
Extended time limit
Below avg (41%) #19 of 296
76%
Minor dwellings approved
164 decided (1-9 homes)
88%
Major dwellings approved
8 decided (10+ homes)
79%
Change of use approved
52 decided
1,304
Total decisions
168 refused in the year to March 2026