Cherrytree Sutterton Drove, Amber Hill, Boston PE20 3RF Data via plota.co.uk

B/25/0426 - Full Planning Permission Approved

Proposal

Replacement chalet bungalow (dwelling) with attached double garage (Self build) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Oct 2025
✓
Validated
10 Nov 2025
✓
Consultation
10 Nov 2025
✓
Approved
5 Mar 2026

Approved on 5 Mar 2026 · Delegated Decision · Last checked 7 Oct 2026

Associated applications 2

Site constraints 3

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 199 m away: Triton Knoll Electrical System
The site is 199 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: Eastern Green Link 3 and Eastern Green Link 4 (at pre-application, 1.9 km).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £137,500 in June 2025. Detached house, freehold.

27 June 2025£137,500
28 November 1997£67,950

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area108 m² (1,163 sq ft)
Energy ratingF (32 out of 100), could reach A
PropertyDetached bungalow, 6 habitable rooms
Built1930 to 1949
HeatingElectric storage heaters
WallsCavity wall, as built, no insulation (assumed)

From the energy performance certificate lodged in December 2021, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Boston - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Boston
Application type
Full Planning Permission
Postcode
PE20 3RF
Received
27 Oct 2025
Validated
10 Nov 2025
Ward
Swineshead And Holland Fen Ward
Parish
Amber Hill
Case officer
Show
Target decision
5 Jan 2026
Decision
Approved
Decision date
5 Mar 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Raw Architecture Ltd

How this decision compares

Decided in 115 days from validation, 55 days slower than Boston's median of 60 for full applications. Approved, as 92% of full applications here are.

42%decided within 8 weeks
92%approved
206decided in the last year

Plota live figures for full applications decided by Boston in the last twelve months, from validation. Boston decision record →

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14438412
Planning Portal ref
PP-14438412
Consultation
10 Nov 2025
Comments by
1 Dec 2025
Statutory expiry
5 Jan 2026
Env. assessment
No

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.