PA/26/01559/S - Non-material amendment (TCPA S96a) Registered

Proposal

Application for Non-Material amendment to planning permission ref: , Dated 06/12/2024. Non Material amendment(s) Sought: This pack sets out a Non-Material Amendment to planning permission for Caxton Grove. The amendment arises from one technical decision: the consented communal air source heat pump (ASHP) heat network is replaced by individual exhaust air heat pumps (EAHPs) serving each of the 36 dwellings. Every other change in the drawing package follows from it. The case for the energy strategy itself is made in the Whitecode Energy Feasibility Strategy submitted with this application; this pack sets out what the change means for the drawings. The consented strategy provided a site-wide heat network, sized and located to future-proof a connection to a district heat network. Whitecode confirm that no connectable network exists ? both identified East London Energy networks lie over 500 m from the site and the operator has confirmed that connection is not viable ? so the safeguarding benefit cannot be realised, while the network's distribution and standing losses would be incurred from day one. On a like-for-like basis the amended scheme saves 76% of regulated carbon site-wide against 65% for the communal option. The architectural consequences are all reductions. The two rooftop ASHP enclosures (1.6 � 5.4 m each) and their louvred plant screens are removed from the roof and from the elevations; the basement ? which housed only the Energy Centre and the water tanks ? is omitted; and the ground floor gains active frontage where plant louvres are no longer required. Photovoltaic capacity is retained at 24.8 kWp and is now distributed across both roofs. There is no change to the number, mix or size of dwellings (36 units), to the number of storeys or the storey heights, to the building footprint or to the site layout and landscaping. The external palette follows the consented specification, with the brick types and the metalwork RAL now confirmed; Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 8 Sept 2026
Decision
Expected by 6 Oct 2026

This application is under consideration - no decision has been issued yet. A decision is expected by 6 Oct 2026.

Documents 19

Plans & drawings 16

PDF CAX-GSS-XX-ZZ-DR-AR-0560 P01 DETAILED SOUTH ELEVATION AND SECTION Current Plan · 8 Sept 2026 View ↗ PDF CAX-GSS-XX-ZZ-DR-AR-0561 P01 DETAILED WEST ELEVATION AND SECTION Current Plan · 8 Sept 2026 View ↗ PDF CAX-GSS-XX-ZZ-DR-AR-0461 P01 CONTEXT NORTH AND SOUTH ELEVATIONS Current Plan · 8 Sept 2026 View ↗ PDF CAX-GSS-XX-ZZ-DR-AR-0462 P01 CONTEXT EAST AND WEST ELEVATIONS Current Plan · 8 Sept 2026 View ↗ PDF CAX-GSS-XX-ZZ-DR-AR-0550 P01 S01 SECTION Current Plan · 8 Sept 2026 View ↗ PDF CAX-GSS-XX-ZZ-DR-AR-0454 P01 WEST ELEVATION - COLOURED Current Plan · 8 Sept 2026 View ↗ PDF CAX-GSS-XX-ZZ-DR-AR-0452 P01 NORTH ELEVATION - COLOURED Current Plan · 8 Sept 2026 View ↗ PDF CAX-GSS-XX-ZZ-DR-AR-0453 P01 EAST ELEVATION - COLOURED Current Plan · 8 Sept 2026 View ↗ PDF CAX-GSS-XX-RF-DR-AR-0160 P01 SITE ROOF PLAN Current Plan · 8 Sept 2026 View ↗ PDF CAX-GSS-XX-ZZ-DR-AR-0451 P01 SOUTH ELEVATION - COLOURED Current Plan · 8 Sept 2026 View ↗ PDF CAX-GSS-SW-XX-DR-AR-0150 P01 LOCATION PLAN AS PROPOSED Current Plan · 8 Sept 2026 View ↗ PDF CAX-GSS-XX-RF-DR-AR-0260 P01 ROOF PLAN Current Plan · 8 Sept 2026 View ↗ PDF CAX-GSS-XX-09-DR-AR-0259 P01 NINTH FLOOR PLAN Current Plan · 8 Sept 2026 View ↗ PDF CAX-GSS-XX-GF-DR-AR-0250 P01 GROUND FLOOR PLAN WITH CC PLANS Current Plan · 8 Sept 2026 View ↗ PDF CAX-GSS-XX-GF-DR-AR-9000 P01 PROPOSED CYCLE STORE - GROUND FLOOR PLAN Current Plan · 8 Sept 2026 View ↗ PDF CAX-GSS-XX-09-DR-AR-0159 P01 SITE NINTH FLOOR PLAN Current Plan · 8 Sept 2026 View ↗

All documents on the council site ↗

Associated applications 4

Site constraints 3

Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Tower Hamlets built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 22 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Non-material amendment (TCPA S96a)
Postcode
E3 2EE
Received
around 8 Sept 2026
Validated
8 Sept 2026
Ward
Bow West
Case officer
Show
Target decision
6 Oct 2026
Decision level
Delegated
Applicant
Show
Agent
Formation Design & Build Ltd

Consultation & key dates

Statutory expiry
6 Oct 2026
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Major dwellings

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026